Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00656
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9596 E HARKES DR
Address NEW:
9596 E HARKES DR
Apply Date:
06/21/2024
Applicant:
Brianna Quiroz
Description:
Indiana Dunes Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-0524-00656
Permit Status: Complete
Permit Description: Indiana Dunes Model Plan La Escalera
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/21/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/24/2024 | APPROVED |
| 05/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/07/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00656
Permit Status: Complete
Permit Description: Indiana Dunes Model Plan La Escalera
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/24/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/28/2024 | Post-Tension Inspection Report is required. | |
| 05/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00656
Permite Description: Indiana Dunes Model Plan La Escalera
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 11-14-24, add shot pins to marked locations behind shear wall, properly nail down nails to sill plate to upstairs master bedroom (locations marked), and add nails to roof at marked location in master bedroom l |
| 11/14/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 11-14-24, add shot pins to marked locations behind shear wall, properly nail down nails to sill plate to upstairs master bedroom (locations marked), and add nails to roof at marked location in master bedroom l |
| 01/24/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | n/a |
| 01/24/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | n/a |
| 10/21/2024 | COT - RSPL - Yard Water Line | N/A | Partial Pass | PARTIAL PASS--Water meter is not installed and water line to house is under 60# psi pressure with no leaks. Okay to shade pipe and backfill trench. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00656
Permit Description: Indiana Dunes Model Plan La Escalera
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve is installed. Okay to shade pipe and backfill trench. | |
| 10/21/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a water test with no leaks. Okay to shade pipe and backfill trenches. | |
| 10/21/2024 | COT - RSPL - Sewer | Passed | Sewer line is connected and under water pressure test with no leaks. Okay to shade pipe and backfill trench. | |
| 11/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-1-24, per approved plans. Okay to pour concrete. | |
| 11/01/2024 | COT - RSBU - Preslab | Passed | 11-1-24, per approved plans. Okay to pour concrete. | |
| 11/01/2024 | COT - RSEL - Electrical Underground | Passed | 11-1-24, per approved plans. Okay to pour concrete. | |
| 11/01/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-1-24, per approved plans. Okay to pour concrete. | |
| 12/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-3-24, exterior clips/sheathing, truss bracing and roof nailing approved. | |
| 12/03/2024 | COT - RSBU - Roof Nailing | Passed | 12-3-24, exterior clips/sheathing, truss bracing and roof nailing approved. | |
| 01/29/2025 | BULD - Electrical Clearance | Passed | 1/24/25 approval for TEP ECO | |
| 02/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/4/25 corrections made | |
| 06/18/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/18/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/18/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/18/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/18/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/18/2025 | COT - RSPL - Yard Water Line | Passed | Approved. 6/18/2025 | |
| 06/18/2025 | ENGR Engineering Final | Passed | ||
| 06/18/2025 | RSBU - Building Progress | Passed | ||
| 06/18/2025 | RSBU - Building Final | Passed |