Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/08/2024
Applicant:
Paul Corr
Description:
SFR RKM45X T21-M0094 REVISION-Structural change

Permit Reviews

Permit Number - TC-MDP-0524-00642
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Start Date Submittal Complete Date Status  
08/07/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/13/2024 REQUIRES RESUBMIT Review Details
08/28/2024 RESTAMP - RESIDENTIAL v.1 08/29/2024 APPROVED Review Details
07/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/09/2024 REQUIRES RESUBMIT Review Details
08/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00642
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Outstanding Activity Conditions - 6
Date Name
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/09/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/09/2024 Post-Tension Inspection Report is required.
07/09/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00642
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Date Description Comments
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00642
Permite Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/24/2024 COT - RSBU - Interior Shear Bracing N/A Not Ready Not ready, missing sections of drywall
03/11/2025 RSBU - Building Final N/A Re-inspection required 11 Mar 25
1. Wrong size breakers on A/C unit. One of the units calls for 30 amp max and is on a 40 amp.
2. Kitchen Exhaust incomplete and no power.
03/11/2025 COT - RSEL - Electrical Final N/A Re-inspection required 11 Mar 25
1. Wrong size breakers on A/C unit. One of the units calls for 30 amp max and is on a 40 amp.
2. Kitchen Exhaust incomplete and no power.
03/11/2025 COT - RSME - Mechanical Final N/A Re-inspection required 11 Mar 25
1. Wrong size breakers on A/C unit. One of the units calls for 30 amp max and is on a 40 amp.
2. Kitchen Exhaust incomplete and no power.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00642
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/05/2024 COT - RSPL - Rough Soil Passed
09/05/2024 COT - RSPL - Sewer Passed
09/05/2024 COT - RSPL - Yard Water Line Passed
09/13/2024 COT - RSBU - Preslab Passed Okay to pour concrete for footings and slab. Ufer ground is in place.
09/13/2024 COT - RSEL - Electrical Underground Passed Okay to pour concrete for footings and slab. Ufer ground is in place. Underground electrical for kitchen island is installed.
09/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Okay to pour concrete for footings and slab. Ufer ground is in place.
10/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/14/2024 COT - RSBU - Roof Nailing Passed
12/04/2024 COT - RSPL - Gas Pressure Test Passed 12-4-24, verified at 15psi.
12/04/2024 BULD - Electrical Clearance Passed 12-4-24, panel ok to be energized. ECO sent to TEP.
12/06/2024 COT - RSEL - Grounding/Bonding Passed 12/6/24 Ufer has grounding and water and gas are bonded. Pass
12/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-10-24, approved.
12/27/2024 COT - RSBU - Interior Shear Bracing Passed 12/27/24 passed, ok to tape
02/26/2025 COT - BULD - SWG Clearance Passed 26 FEB 25
Southwest gas clearance: SWG
03/11/2025 ENGR Engineering Final Passed CO Ready
03/11/2025 COT - RSEL - Outdoor Lighting Passed
03/11/2025 COT - RSPL - Plumbing Final Passed
03/11/2025 RSBU - Building Progress Passed
03/14/2025 RSBU - Building Final Passed 14 March 25
Pass
03/14/2025 COT - RSEL - Electrical Final Passed 14 March 25
Pass
03/24/2025 COT - RSME - Mechanical Final Passed 3-24-25, mechanical final approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V3.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-07-08_V1.PDF DOCUMENTS VIEW