Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9811 E GRAY HAWK DR
Apply Date:
05/22/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan

Permit Reviews

Permit Number - TC-MDP-0524-00639
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Start Date Submittal Complete Date Status  
12/12/2024 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.2 12/12/2024 APPROVED Review Details
02/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/12/2025 APPROVED Review Details
02/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/25/2025 APPROVED Review Details
05/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/29/2024 APPROVED Review Details
11/22/2024 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 12/12/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00639
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
Date Name
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0524-00639
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Date Description Comments
05/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/17/2024 Post-Tension Inspection Report is required.
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/28/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00639
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/30/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Canceled 12-30-24, canceled by contractor.
12/30/2024 COT - RSBU - Roof Nailing N/A Canceled 12-30-24, canceled by contractor.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00639
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/03/2024 COT - RSPL - Backwater Valve Passed Installed per plans 12/3/4
12/03/2024 COT - RSPL - Rough Soil Passed Installed per plans 12/3/4. Great water and cleanouts per code
12/03/2024 COT - RSPL - Sewer Passed Installed per plans 12/3/4. Great water and cleanouts per code
12/03/2024 COT - RSPL - Yard Water Line Passed installed per schedule
12/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-11-24, setbacks, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete.
12/11/2024 COT - RSBU - Preslab Passed 12-11-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete.
12/11/2024 COT - RSEL - Electrical Underground Passed 12-11-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete.
12/11/2024 COT - RSEL - Grounding/Bonding Passed 12-11-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete.
12/12/2024 BULD - Electrical Clearance Passed 12-12-24, electrical panel okay to be energized. ECO clearance sent to TEP.
01/02/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/2/25 pass
01/02/2025 COT - RSBU - Roof Nailing Passed 1/2/25 pass
01/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to drywall 1/22/25
01/22/2025 COT - RSPL - Gas Pressure Test Passed Held pressure 1/22/25
01/28/2025 RSBU - Building Progress Passed
02/07/2025 COT - RSBU - Interior Shear Bracing Passed 2/7/25: Drywall for interior shear walls is properly secured to studs per plan requirements. Okay to proceed with tape, texture, and paint.
03/12/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 3/6/25
03/19/2025 COT - RSEL - Outdoor Lighting Passed 3/19/25 passed
03/19/2025 COT - RSME - Mechanical Final Passed
03/19/2025 COT - RSPL - Plumbing Final Passed 3/19/25 passed
03/19/2025 ENGR Engineering Final Passed
03/24/2025 COT - RSEL - Electrical Final Passed 3-24-25, electrical final approved.
03/24/2025 RSBU - Building Final Passed 3-24-25, building final approved.

Documents

File Name Document Type  
CDC 16 SIC-2025-02-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 16 REV1 D1_V1.PDF DOCUMENTS VIEW
CDC 16 REV1 NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 16 D1_V1.PDF DOCUMENTS VIEW
CDC 16 SIC-2024-05-22_V1.PDF DOCUMENTS VIEW