Permit: TC-MDP-0524-00639
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9811 E GRAY HAWK DR
Address NEW:
9811 E GRAY HAWK DR
Apply Date:
05/22/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00639
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION REVISION v.2 | 12/12/2024 | APPROVED |
| 02/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/12/2025 | APPROVED |
| 02/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/25/2025 | APPROVED |
| 05/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/29/2024 | APPROVED |
| 11/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 | 12/12/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00639
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00639
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Date | Description | Comments |
|---|---|---|
| 05/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/17/2024 | Post-Tension Inspection Report is required. | |
| 05/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/28/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00639
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Canceled | 12-30-24, canceled by contractor. |
| 12/30/2024 | COT - RSBU - Roof Nailing | N/A | Canceled | 12-30-24, canceled by contractor. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00639
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2024 | COT - RSPL - Backwater Valve | Passed | Installed per plans 12/3/4 | |
| 12/03/2024 | COT - RSPL - Rough Soil | Passed | Installed per plans 12/3/4. Great water and cleanouts per code | |
| 12/03/2024 | COT - RSPL - Sewer | Passed | Installed per plans 12/3/4. Great water and cleanouts per code | |
| 12/03/2024 | COT - RSPL - Yard Water Line | Passed | installed per schedule | |
| 12/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-11-24, setbacks, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
| 12/11/2024 | COT - RSBU - Preslab | Passed | 12-11-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
| 12/11/2024 | COT - RSEL - Electrical Underground | Passed | 12-11-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
| 12/11/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-11-24, grounding/bonding, electrical underground, preslab verified as per approved plans. Okay to pour concrete. | |
| 12/12/2024 | BULD - Electrical Clearance | Passed | 12-12-24, electrical panel okay to be energized. ECO clearance sent to TEP. | |
| 01/02/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/2/25 pass | |
| 01/02/2025 | COT - RSBU - Roof Nailing | Passed | 1/2/25 pass | |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to drywall 1/22/25 | |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure 1/22/25 | |
| 01/28/2025 | RSBU - Building Progress | Passed | ||
| 02/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2/7/25: Drywall for interior shear walls is properly secured to studs per plan requirements. Okay to proceed with tape, texture, and paint. | |
| 03/12/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 3/6/25 | |
| 03/19/2025 | COT - RSEL - Outdoor Lighting | Passed | 3/19/25 passed | |
| 03/19/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/19/2025 | COT - RSPL - Plumbing Final | Passed | 3/19/25 passed | |
| 03/19/2025 | ENGR Engineering Final | Passed | ||
| 03/24/2025 | COT - RSEL - Electrical Final | Passed | 3-24-25, electrical final approved. | |
| 03/24/2025 | RSBU - Building Final | Passed | 3-24-25, building final approved. |