Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
06/20/2024
Applicant:
Description:
SFR RKF55I T21-M0086

Permit Reviews

Permit Number - TC-MDP-0524-00632
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086
Start Date Submittal Complete Date Status  
06/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/24/2024 APPROVED Review Details
06/25/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/27/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00632
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
Date Name
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/24/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 Post-Tension Inspection Report is required.
06/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00632
Permit Status: Inspections
Permit Description: SFR RKF55I T21-M0086
Date Description Comments
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0524-00632
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/09/2024 COT - RSPL - Rough Soil Passed
08/09/2024 COT - RSPL - Sewer Passed
08/09/2024 COT - RSPL - Yard Water Line Passed
08/09/2024 COT - RSPL - Backwater Valve Passed
08/23/2024 COT - RSEL - Electrical Underground Passed Electrical conduit for kitchen island installed and secured.
08/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/26/2024 COT - RSBU - Preslab Passed
08/26/2024 COT - RSEL - Grounding/Bonding Passed
09/27/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed pass
09/27/2024 COT - RSBU - Roof Nailing Passed pass
11/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation.
11/04/2024 COT - RSPL - Gas Pressure Test Passed Gasline is under 15 psi of air pressure with no leaks. Okay to proceed.
01/15/2025 BULD - Electrical Clearance Passed 1/15/25 ready for temp power CLEARANCE ECO
01/31/2025 COT - RSBU - Interior Shear Bracing Passed 1/31/21 pass. Contractor has provided a letter confirming that interior sheathed was installed per schedule.
01/31/2025 COT - BULD - SWG Clearance Passed 1/31/25 approval for SWG clearance
02/05/2025 COT - RSEL - Electrical Final Passed Passed final 2/5/25 Clearance ECO
02/05/2025 COT - RSEL - Outdoor Lighting Passed Passed final 2/5/25
02/05/2025 COT - RSME - Mechanical Final Passed Passed final 2/5/25
02/05/2025 COT - RSPL - Plumbing Final Passed Passed final 2/5/25
02/05/2025 RSBU - Building Final Passed Passed final 2/5/25
02/25/2025 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
F55I APPROVED TRUSS CALCS 7-29-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-20_V1.PDF DOCUMENTS VIEW