Permit: TC-MDP-0524-00631
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12872 E TORTOISE POINTE DR
Address NEW:
12872 E TORTOISE POINTE DR
Apply Date:
06/06/2024
Applicant:
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - TC-MDP-0524-00631
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/15/2024 | APPROVED |
| 06/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
| 06/07/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00631
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 06/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/07/2024 | Post-Tension Inspection Report is required. |
| 06/07/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00631
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Date | Description | Comments |
|---|---|---|
| 05/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00631
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | COT - RSPL - Sewer | Passed | 8/7/24: underground plumbing is complete and connected to the main sewer line. Okay to shade pipe and backfill trenches. | |
| 08/07/2024 | COT - RSPL - Yard Water Line | Passed | Main water line to house is connected to the city main with a meter and tracer wire. Okay to shade pipe and backfill trench. | |
| 08/07/2024 | COT - RSPL - Rough Soil | Passed | 8/7/24: underground plumbing is complete and connected to the main sewer line. Okay to shade pipe and backfill trenches. | |
| 08/19/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Corrections were made. 8/20/2024 | |
| 08/20/2024 | COT - RSBU - Preslab | Passed | ||
| 09/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
| 09/11/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
| 10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-31-24, intermediates approved. | |
| 10/31/2024 | BULD - Electrical Clearance | Passed | 10-31-24, panel okay to be energized. Clearance issued to TEP | |
| 10/31/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-31-24, gas pressure approved. | |
| 11/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-18-24, interior shear bracing verified as per approved plans. Okay to tape & texture. | |
| 01/16/2025 | COT - BULD - SWG Clearance | Passed | 1-16-25, approved for Southwest Gas to install meter. Clearance issued. | |
| 02/03/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/3/25 | |
| 02/03/2025 | RSBU - Building Final | Passed | Passed 2/3/25 | |
| 02/03/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/3/25 | |
| 02/03/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/3/25 | |
| 02/03/2025 | RSBU - Building Progress | Passed | Passed final 2/3/25 | |
| 02/03/2025 | COT - RSEL - Electrical Final | Passed | Passed 2/3/25 CLEARANCE ECO | |
| 02/13/2025 | ENGR Engineering Final | Passed |