Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00629
Permit Details
Apply Date:
05/13/2024
Applicant:
Varnado Standifer
Description:
Blackhawk T933 - Beech
Permit Reviews
Permit Number - TC-MDP-0524-00629
Permit Status: Issued
Permit Description: Blackhawk T933 - Beech
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/16/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00629
Permit Status: Issued
Permit Description: Blackhawk T933 - Beech
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/13/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
05/13/2024 | Post-Tension Inspection Report is required. |
05/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00629
Permit Status: Issued
Permit Description: Blackhawk T933 - Beech
Date | Description | Comments |
---|---|---|
05/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00629
Permite Description: Blackhawk T933 - Beech
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
RSBU - Building Final | N/A | Requested |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00629
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 6/24/2024 | |
06/24/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 6/24/2024 | |
07/05/2024 | COT - RSBU - Preslab | Passed | ||
07/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/05/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/03/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 9/3/2024 | |
09/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/03/2024 | COT - RSPL - Backwater Valve | Passed | ||
09/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/04/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/4/2024 | |
09/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/24/2024 | RSBU - Building Progress | Passed | 10-24-24 okay to pour entry. | |
11/19/2024 | ENGR Engineering Final | Passed | CO Ready | |
11/19/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-19-24, outdoor lighting approved. | |
11/21/2024 | COT - BULD - SWG Clearance | Passed | 11-21-24, approved for Southwest Gas to connect meter. | |
11/22/2024 | COT - RSEL - Electrical Final | Passed | 11-22-24, electrical final approved. | |
11/22/2024 | COT - RSME - Mechanical Final | Passed | 11-22-24, mechanical final approved. | |
11/22/2024 | COT - RSPL - Plumbing Final | Passed | 11-22-24, plumbing final approved. |