Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6077 E CAMPOLINA TR
Apply Date:
05/13/2024
Applicant:
Brian Jones
Description:
Blackhawk T933 - Beech

Permit Reviews

Permit Number - TC-MDP-0524-00627
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
Start Date Submittal Complete Date Status  
08/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/11/2025 APPROVED Review Details
05/16/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/22/2024 APPROVED Review Details
08/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/19/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00627
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
Date Description Comments
05/13/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/22/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/13/2024 Post-Tension Inspection Report is required.
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/20/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00627
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/26/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading required. 6/26/2024
06/26/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 6/26/2024
06/26/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 6/26/2024
07/10/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/10/2024 COT - RSBU - Preslab Passed
07/10/2024 COT - RSEL - Electrical Underground Passed
07/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/26/2024 COT - RSBU - Roof Nailing Passed
09/09/2024 COT - RSPL - Yard Water Line Passed
09/09/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/9/2024
09/09/2024 COT - RSEL - Grounding/Bonding Passed
09/09/2024 COT - RSPL - Gas Pressure Test Passed
09/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/16/2024 RSBU - Building Progress Passed 10/16/24: entry way pre-slab passed ok to proceed.
12/10/2024 COT - RSBU - Interior Shear Bracing Passed
12/10/2024 COT - RSEL - Electrical Final Passed PASSED 12/10/24, ONLY NEEDS GAS METER and cooking appliances needed at final
12/10/2024 ENGR Engineering Final Passed CO Ready
12/10/2024 COT - RSPL - Plumbing Final Passed PASSED 12/10/24, ONLY NEEDS GAS METER and cooking appliances needed at final
12/10/2024 COT - RSEL - Outdoor Lighting Passed PASSED 12/10/24, ONLY NEEDS GAS METER and cooking appliances needed at final
12/10/2024 COT - RSME - Mechanical Final Passed No
12/10/2024 COT - BULD - SWG Clearance Passed PASSED 12/10/24, ONLY NEEDS GAS METER and cooking appliances needed at final
CLEARANCE SWG
12/17/2024 RSBU - Building Final Passed No