Permit: TC-MDP-0524-00624
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
742 W LIMBERLOST DR
Address NEW:
742 W LIMBERLOST DR
Apply Date:
05/13/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0524-00624
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/07/2024 | RESTAMP - RESIDENTIAL v.1 | 10/08/2024 | APPROVED |
| 10/04/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 10/07/2024 | APPROVED |
| 08/21/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 09/17/2024 | REQUIRES RESUBMIT |
| 09/18/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 10/04/2024 | IN REVIEW |
Conditions
Permit Number - TC-MDP-0524-00624
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Date | Description | Comments |
|---|---|---|
| 05/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00624
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | COT - RSEL - Electrical Final | N/A | Partial Pass | 1/14/25 knock out needed at main panel, partial pass |
| 01/14/2025 | COT - RSPL - Plumbing Final | N/A | Partial Pass | 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel. |
| 01/14/2025 | COT - RSPL - Yard Water Line | N/A | Re-inspection required | 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel. water line has not been provided for unit 1 |
| 01/14/2025 | RSBU - Building Progress | N/A | Not Ready | |
| 01/14/2025 | COT - RSME - Mechanical Final | N/A | Not Ready | 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel. Water line has not even provided for unit 1 |
| 01/14/2025 | RSBU - Building Final | N/A | Partial Pass | 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00624
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 19