Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
742 W LIMBERLOST DR
Apply Date:
05/13/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-0524-00624
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
10/07/2024 RESTAMP - RESIDENTIAL v.1 10/08/2024 APPROVED Review Details
10/04/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 10/07/2024 APPROVED Review Details
08/21/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/17/2024 REQUIRES RESUBMIT Review Details
09/18/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/04/2024 IN REVIEW Review Details

Conditions

Permit Number - TC-MDP-0524-00624
Permit Status: Inspections complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00624
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/14/2025 COT - RSEL - Electrical Final N/A Partial Pass 1/14/25 knock out needed at main panel, partial pass
01/14/2025 COT - RSPL - Plumbing Final N/A Partial Pass 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel.
01/14/2025 COT - RSPL - Yard Water Line N/A Re-inspection required 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel. water line has not been provided for unit 1
01/14/2025 RSBU - Building Progress N/A Not Ready
01/14/2025 COT - RSME - Mechanical Final N/A Not Ready 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel. Water line has not even provided for unit 1
01/14/2025 RSBU - Building Final N/A Partial Pass 1/14/25 unit 1 has not been connected with water, knock out plate needed at the main panel.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00624
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 19