Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
05/13/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0524-00618
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
09/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/24/2024 APPROVED Review Details
08/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/07/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00618
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Total Outstanding Activity Conditions - 5
Date Name
05/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/07/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0524-00618
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0524-00618
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/20/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is connected to main sewer line with tracer wire attached to pipe, and system is under a water iest. Backwater valve is installed. Okay to shade pipe and backfill trenches.
11/20/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line with tracer wire attached to pipe, and system is under a water iest. Backwater valve is installed. Okay to shade pipe and backfill trenches.
11/20/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line with tracer wire attached to pipe, and system is under a water iest.

Documents

File Name Document Type  
LOT 55 PLOT PLAN REV1_V1.PDF DOCUMENTS VIEW
TC-MDP-0524-00618 REVISION 9.17.24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 55 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 55 SPECIAL INSPECTION CERTIFICATE-2024-08-01_V1.PDF DOCUMENTS VIEW