Permit: TC-MDP-0524-00618
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
502 N GRAY SLATE DR
Address NEW:
502 N GRAY SLATE DR
Apply Date:
05/13/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0524-00618
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/24/2024 | APPROVED |
| 08/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/07/2024 | APPROVED |
| 01/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/30/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00618
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Date | Description | Comments |
|---|---|---|
| 08/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/07/2024 | Post-Tension Inspection Report is required. | |
| 05/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 08/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00618
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is connected to main sewer line with tracer wire attached to pipe, and system is under a water iest. Backwater valve is installed. Okay to shade pipe and backfill trenches. | |
| 11/20/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line with tracer wire attached to pipe, and system is under a water iest. Backwater valve is installed. Okay to shade pipe and backfill trenches. | |
| 11/20/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line with tracer wire attached to pipe, and system is under a water iest. | |
| 12/02/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/02/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/17/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/17/24 corrections have been made | |
| 12/17/2024 | COT - RSBU - Roof Nailing | Passed | 12/17/24 corrections have been made | |
| 01/28/2025 | COT - RSEL - Grounding/Bonding | Passed | 1-28-25, grounding/bonding approved | |
| 01/28/2025 | BULD - Electrical Clearance | Passed | 1-28-25, panel approved to be energized. ECO clearance sent to TEP | |
| 01/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-28-25, residential intermediate approved. Okay to continue with construction. | |
| 01/28/2025 | COT - RSPL - Gas Pressure Test | Passed | 1-28-25, gas pressure test approved. | |
| 01/28/2025 | COT - RSPL - Yard Water Line | Passed | 1-28-25, approved. | |
| 02/10/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly secured to studs per plan requirements. Okay to proceed with tape, texture, and paint. | |
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 3-19-25, okay for SWG to install meter. Clearance issued. | |
| 04/02/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/2/25 CLEARANCE ECO | |
| 04/02/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/2/25 | |
| 04/02/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | ENGR Engineering Final | Passed | Cane nursery stakes no longer accepted on trees. | |
| 04/02/2025 | RSBU - Building Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | RSBU - Building Progress | Passed | Passed final 4/2/25 |