Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00615
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
534 N GRAY SLATE DR
Address NEW:
534 N GRAY SLATE DR
Apply Date:
05/16/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0524-00615
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/22/2024 | APPROVED |
| 11/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00615
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Date | Description | Comments |
|---|---|---|
| 05/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/21/2024 | Post-Tension Inspection Report is required. | |
| 05/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00615
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 10/14/24: rsp clips missing exterior. Trust bearing on top plate splice. Add shot pins at interior walls where marked. |
| 10/14/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 10/14/24: rsp clips missing exterior. Trust bearing on top plate splice. Add shot pins at interior walls where marked. |
| 09/27/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00615
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/19/2024 | COT - RSPL - Sewer | Passed | ||
| 09/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/27/2024 | COT - RSBU - Preslab | Passed | ||
| 09/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/15/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 11/15/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-15-24, approved | |
| 11/15/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-15-24, pressure test approved | |
| 11/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-15-24, intermediates approved. Okay to continue with construction. | |
| 11/27/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and secured to studs per plan requirements. Okay to proceed with tape, texture, and paint. | |
| 01/06/2025 | BULD - Electrical Clearance | Passed | TEP Clearance Code: ECO | |
| 01/28/2025 | COT - BULD - SWG Clearance | Passed | 1-28-25, okay for Southwest gas to install meter. Clearance issued. | |
| 02/07/2025 | COT - RSEL - Electrical Final | Passed | Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit. | |
| 02/07/2025 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit. | |
| 02/07/2025 | COT - RSME - Mechanical Final | Passed | Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit. | |
| 02/07/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 02/07/2025 | ENGR Engineering Final | Passed | Engineering Final is good. | |
| 02/07/2025 | RSBU - Building Final | Passed | Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit. | |
| 02/07/2025 | RSBU - Building Progress | Passed | Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit. |