Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
534 N GRAY SLATE DR
Apply Date:
05/16/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0524-00615
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
05/17/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/22/2024 APPROVED Review Details
11/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00615
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
05/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/21/2024 Post-Tension Inspection Report is required.
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00615
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 10/14/24: rsp clips missing exterior. Trust bearing on top plate splice. Add shot pins at interior walls where marked.
10/14/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 10/14/24: rsp clips missing exterior. Trust bearing on top plate splice. Add shot pins at interior walls where marked.
09/27/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00615
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/19/2024 COT - RSPL - Rough Soil Passed
09/19/2024 COT - RSPL - Sewer Passed
09/19/2024 COT - RSPL - Yard Water Line Passed
09/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/27/2024 COT - RSBU - Preslab Passed
09/27/2024 COT - RSEL - Electrical Underground Passed
10/15/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/15/2024 COT - RSBU - Roof Nailing Passed
11/15/2024 COT - RSEL - Grounding/Bonding Passed 11-15-24, approved
11/15/2024 COT - RSPL - Gas Pressure Test Passed 11-15-24, pressure test approved
11/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11-15-24, intermediates approved. Okay to continue with construction.
11/27/2024 COT - RSBU - Interior Shear Bracing Passed Drywall for interior shear walls is properly installed and secured to studs per plan requirements. Okay to proceed with tape, texture, and paint.
01/06/2025 BULD - Electrical Clearance Passed TEP Clearance Code: ECO
01/28/2025 COT - BULD - SWG Clearance Passed 1-28-25, okay for Southwest gas to install meter. Clearance issued.
02/07/2025 COT - RSEL - Electrical Final Passed Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit.
02/07/2025 COT - RSEL - Outdoor Lighting Passed Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit.
02/07/2025 COT - RSME - Mechanical Final Passed Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit.
02/07/2025 COT - RSPL - Plumbing Final Passed
02/07/2025 ENGR Engineering Final Passed Engineering Final is good.
02/07/2025 RSBU - Building Final Passed Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit.
02/07/2025 RSBU - Building Progress Passed Construction is completed per plan. All mechanical, electrical, and plumbing fixtures are installed and operational. Outdoor lighting is installed per plan and city requirements. Okay to issue Certificate of Occupancy for this house and permit.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
150465 PT LOT 51 COMPLETE-2024-11-07_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 51 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 51 SPECIAL INSPECTION CERTIFICATE-2024-05-16_V1.PDF DOCUMENTS VIEW