Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
08/12/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0524-00614
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
01/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/06/2025 APPROVED Review Details
08/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00614
Permit Status: Issued
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
08/21/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/21/2024 Post-Tension Inspection Report is required.
05/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0524-00614
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 13
Date Description Inspector Results Comments
10/28/2024 COT - RSPL - Rough Soil Passed 10-28-24, underground plumbing inspection approved. Okay to backfill.
10/28/2024 COT - RSPL - Sewer Passed 10-28-24, sewer connection inspection approved.
10/28/2024 COT - RSPL - Yard Water Line Passed 10-28-24, main water line inspection approved.
11/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
11/05/2024 COT - RSBU - Preslab Passed
11/05/2024 COT - RSEL - Grounding/Bonding Passed
11/05/2024 COT - RSEL - Electrical Underground Passed
11/25/2024 COT - RSBU - Exterior Clips/Sheathing Passed
11/25/2024 COT - RSBU - Roof Nailing Passed
12/31/2024 BULD - Electrical Clearance Passed 12/31/24 PASS. TEP clearance code: ECO
12/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/31/24 PASS.
12/31/2024 COT - RSPL - Gas Pressure Test Passed 12/31/24 PASS.
01/13/2025 COT - RSBU - Interior Shear Bracing Passed Drywall is properly installed and secured to studs per plan requirements of 4 & 7. Okay to proceed with tape, texture, and paint.

Documents

File Name Document Type  
151434 PT LOT 39 COMPLETE-2024-12-31_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 39 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 39 SPECIAL INSPECTION CERTIFICATE-2024-08-12_V1.PDF DOCUMENTS VIEW