Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/10/2024
Applicant:
Cindy Nemo
Description:
Blackhawk T936 - Palm

Permit Reviews

Permit Number - TC-MDP-0524-00607
Permit Status: Inspections complete
Permit Description: Blackhawk T936 - Palm
Start Date Submittal Complete Date Status  
05/13/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00607
Permit Status: Inspections complete
Permit Description: Blackhawk T936 - Palm
Total Outstanding Activity Conditions - 4
Date Name
05/10/2024 Post-Tension Inspection Report is required.
05/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00607
Permit Status: Inspections complete
Permit Description: Blackhawk T936 - Palm
Date Description Comments
05/28/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/10/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00607
Permite Description: Blackhawk T936 - Palm
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/23/2024 COT - RSEL - Electrical Final N/A Re-inspection required Missing fixture in dining room, outlets in living room do not have power. 12/23/24
12/23/2024 ENGR Engineering Final N/A Not Ready Remove dumpster from front of home.
Grade on right side between porch post and wall seams to have a high grade spot.
Construction trash needs to be removed.

We will no longer require the 2" tree stakes on the following trees, Palo Verde, Mesquite and Desert Willow.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00607
Permit Description: Blackhawk T936 - Palm
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/18/2024 COT - RSPL - Yard Water Line Passed
07/18/2024 COT - RSPL - Sewer Passed
07/18/2024 COT - RSPL - Rough Soil Passed
07/18/2024 COT - RSPL - Backwater Valve Passed
07/25/2024 COT - RSEL - Electrical Underground Passed
07/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/26/2024 COT - RSBU - Preslab Passed
08/16/2024 COT - RSBU - Roof Nailing Passed
08/16/2024 COT - RSBU - Exterior Clips/Sheathing Passed
10/03/2024 COT - RSEL - Grounding/Bonding Passed
10/03/2024 COT - RSPL - Gas Pressure Test Passed
10/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed All corrections were made. 10/7/2024
10/07/2024 BULD - Electrical Clearance Passed
10/24/2024 COT - RSBU - Interior Shear Bracing Passed 10-24-24, shear wall inspection approved. Okay for tape and texture.
12/05/2024 RSBU - Building Progress Passed 12-5-24, verified rebar/wire mesh as per approved plans. okay to pour entryway.
12/23/2024 COT - BULD - SWG Clearance Passed PASSED SWG GAS 12/23/24
12/23/2024 COT - RSEL - Outdoor Lighting Passed Passed final 12/23/24
12/23/2024 COT - RSME - Mechanical Final Passed Passed final 12/23/24
12/23/2024 COT - RSPL - Plumbing Final Passed Passed final 12/23/24
01/13/2025 COT - RSEL - Electrical Final Passed 1/13/25 corrections made CLEARANCE ECO
01/13/2025 ENGR Engineering Final Passed CO Ready
01/13/2025 RSBU - Building Final Passed 1/13/25 corrections made

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK LOT 45_SIC- 6069 E CAMPOLINA TR-2024-05-13_V1.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 45-START_V1.PDF DOCUMENTS VIEW