Permit: TC-MDP-0524-00606
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6073 E CAMPOLINA TR
Address NEW:
6073 E CAMPOLINA TR
Apply Date:
05/10/2024
Applicant:
Brian Jones
Description:
Blackhawk T609 - Lawson
Permit Reviews
Permit Number - TC-MDP-0524-00606
Permit Status: Complete
Permit Description: Blackhawk T609 - Lawson
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 08/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/06/2025 | APPROVED |
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | REQUIRES RESUBMIT |
| 05/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00606
Permit Status: Complete
Permit Description: Blackhawk T609 - Lawson
| Date | Description | Comments |
|---|---|---|
| 05/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/10/2024 | Post-Tension Inspection Report is required. | |
| 05/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00606
Permite Description: Blackhawk T609 - Lawson
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2024 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 7/18/24: missing grey water loop |
| 10/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/18/24: canceled by Brian 10/22/24: nail plates required throughout, seal all penetrations through vapor barrier and top plate, DWV not under pressure, block registers on three sides, missing receptacle at kitchen wall, damaged sheathing at NM Cable must be repaired, |
| 10/22/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 10/18/24: canceled by Brian 10/22/24: nail plates required throughout, seal all penetrations through vapor barrier and top plate, DWV not under pressure, block registers on three sides, missing receptacle at kitchen wall, damaged sheathing at NM Cable must be repaired, |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00606
Permit Description: Blackhawk T609 - Lawson
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 07/18/2024 | COT - RSPL - Sewer | Passed | ||
| 07/18/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 08/01/2024 | COT - RSPL - Rough Soil | Passed | Corrections were made. 8/1/2024 | |
| 08/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 08/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/09/2024 | COT - RSBU - Preslab | Passed | ||
| 08/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/22/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-24-24, listed items from previous inspection have been corrected. No receptacle is required at kitchen wall because there is a center to meet sliding glass door and the receptacle is listed as an option on approved plans. Intermediate inspection approved. | |
| 10/24/2024 | BULD - Electrical Clearance | Passed | 10-24-24, approved for TEP clearance. | |
| 11/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-7-24, interior shear wall per approved plans. Okay to tape and texture drywall. | |
| 12/19/2024 | RSBU - Building Progress | Passed | pass | |
| 01/22/2025 | COT - BULD - SWG Clearance | Passed | 1/22/25 pass clearance for SWG | |
| 01/22/2025 | COT - RSEL - Electrical Final | Passed | 1/22/25 pass | |
| 01/22/2025 | COT - RSEL - Outdoor Lighting | Passed | 1/22/25 pass | |
| 01/22/2025 | COT - RSME - Mechanical Final | Passed | 1/22/25 pass | |
| 01/22/2025 | COT - RSPL - Plumbing Final | Passed | 1/22/25 pass | |
| 01/24/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 05/29/2025 | RSBU - Building Final | Passed |