Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6065 E CAMPOLINA TR
Apply Date:
05/10/2024
Applicant:
Brian Jones
Description:
Blackhawk T934 - Frasier

Permit Reviews

Permit Number - TC-MDP-0524-00603
Permit Status: Complete
Permit Description: Blackhawk T934 - Frasier
Start Date Submittal Complete Date Status  
04/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/14/2025 APPROVED Review Details
08/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/18/2025 APPROVED Review Details
05/13/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/28/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0524-00603
Permit Status: Complete
Permit Description: Blackhawk T934 - Frasier
Date Description Comments
05/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/10/2024 Post-Tension Inspection Report is required.
05/10/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/10/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0524-00603
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/18/2024 COT - RSPL - Yard Water Line Passed
07/18/2024 COT - RSPL - Sewer Passed
07/18/2024 COT - RSPL - Rough Soil Passed
07/18/2024 COT - RSPL - Backwater Valve Passed
07/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/26/2024 COT - RSBU - Preslab Passed
07/26/2024 COT - RSEL - Electrical Underground Passed
08/09/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/09/2024 COT - RSBU - Roof Nailing Passed
09/20/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/20/2024
09/20/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. 9/20/2024
09/20/2024 COT - RSEL - Grounding/Bonding Passed
09/20/2024 COT - RSPL - Gas Pressure Test Passed
10/07/2024 COT - RSBU - Interior Shear Bracing Passed 10/7/24 passed
11/06/2024 RSBU - Building Progress Passed 11-6-24, okay to pour entryway.
12/13/2024 COT - BULD - SWG Clearance Passed PASSED SWG CLEARANCE12/13/24
12/13/2024 COT - RSEL - Electrical Final Passed Passed final 12/13/24
12/13/2024 COT - RSEL - Outdoor Lighting Passed Passed final 12/13/24
12/13/2024 COT - RSME - Mechanical Final Passed Passed final 12/13/24
12/13/2024 COT - RSPL - Plumbing Final Passed Passed final 12/13/24
12/13/2024 ENGR Engineering Final Passed Cut down and glue your clean outs. CO Ready
12/18/2024 RSBU - Building Final Passed Passed final 12/18/24