Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00603
Permit Details
Status:
Issued
Type:
Model Building Permit
Address:
6065 E CAMPOLINA TR
Address NEW:
6065 E CAMPOLINA TR
Apply Date:
05/10/2024
Applicant:
Brian Jones
Description:
Blackhawk T934 - Frasier
Permit Reviews
Permit Number - TC-MDP-0524-00603
Permit Status: Issued
Permit Description: Blackhawk T934 - Frasier
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/14/2025 | APPROVED |
| 08/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/18/2025 | APPROVED |
| 05/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00603
Permit Status: Issued
Permit Description: Blackhawk T934 - Frasier
| Date | Description | Comments |
|---|---|---|
| 05/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/10/2024 | Post-Tension Inspection Report is required. | |
| 05/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00603
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 22