Permit: TC-MDP-0524-00602
Permit Details
Apply Date:
05/10/2024
Applicant:
Cindy Nemo
Description:
Blackhawk T934 - Frasier
Permit Reviews
Permit Number - TC-MDP-0524-00602
Permit Status: Inspections complete
Permit Description: Blackhawk T934 - Frasier
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00602
Permit Status: Inspections complete
Permit Description: Blackhawk T934 - Frasier
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
05/10/2024 | Post-Tension Inspection Report is required. |
05/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
05/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00602
Permit Status: Inspections complete
Permit Description: Blackhawk T934 - Frasier
Date | Description | Comments |
---|---|---|
05/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
05/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00602
Permite Description: Blackhawk T934 - Frasier
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | COT - RSPL - Yard Water Line | N/A | Canceled | 7/18/24: canceled per contractor |
07/18/2024 | COT - RSPL - Sewer | N/A | Canceled | 7/18/24: canceled per contractor |
07/18/2024 | COT - RSPL - Rough Soil | N/A | Canceled | 7/18/24: canceled per contractor |
07/18/2024 | COT - RSPL - Backwater Valve | N/A | Canceled | 7/18/24: canceled per contractor |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00602
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 22