Permit: TC-MDP-0524-00601
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6078 E CAMPOLINA TR
Address NEW:
6078 E CAMPOLINA TR
Apply Date:
05/10/2024
Applicant:
Brian Jones
Description:
Blackhawk T934 - Frasier
Permit Reviews
Permit Number - TC-MDP-0524-00601
Permit Status: Complete
Permit Description: Blackhawk T934 - Frasier
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/10/2025 | REQUIRES RESUBMIT |
| 05/13/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/28/2024 | APPROVED |
| 04/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0524-00601
Permit Status: Complete
Permit Description: Blackhawk T934 - Frasier
| Date | Description | Comments |
|---|---|---|
| 05/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/28/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/10/2024 | Post-Tension Inspection Report is required. | |
| 05/10/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0524-00601
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2024 | COT - RSPL - Backwater Valve | Passed | 10-18-24, backwater valve installed per approved plans. | |
| 10/18/2024 | COT - RSPL - Rough Soil | Passed | 10-18-24, approved. Okay to backfill. | |
| 10/18/2024 | COT - RSPL - Sewer | Passed | 10-18-24, approved. Okay to backfill. | |
| 10/18/2024 | COT - RSPL - Yard Water Line | Passed | 10-18-24, approved. Okay to backfill. | |
| 10/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10-29-24, set backs verified. Okay to pour concrete. | |
| 10/29/2024 | COT - RSBU - Preslab | Passed | 10-29-24, preslab inspection approved. Okay to pour concrete | |
| 10/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 11/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-13-24, listed items from previous items were corrected. Okay to continue with construction. | |
| 11/13/2024 | COT - RSBU - Roof Nailing | Passed | 11-13-24, listed items from previous items were corrected. Okay to continue with construction. | |
| 12/04/2024 | BULD - Electrical Clearance | Passed | 12-4-24, panel okay to be energized. ECO clearance issued to TEP. | |
| 12/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-4-24, residential intermediate inspection approved. | |
| 12/04/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-4-24, grounding/bonding approved. | |
| 12/04/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-4-24, gas pressure test approved. | |
| 12/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/20/24 pass | |
| 01/21/2025 | RSBU - Building Progress | Passed | 1-21-25, okay to pour entryway | |
| 03/18/2025 | COT - BULD - SWG Clearance | Passed | 3/18/25 CLEARANCE SWG | |
| 03/18/2025 | COT - RSEL - Electrical Final | Passed | 3/18/25 corrections made | |
| 03/18/2025 | COT - RSEL - Outdoor Lighting | Passed | 3/18/25 corrections made | |
| 03/18/2025 | COT - RSME - Mechanical Final | Passed | 3/18/25 corrections made | |
| 03/18/2025 | COT - RSPL - Plumbing Final | Passed | 3/18/25 corrections made | |
| 03/27/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/27/2025 | RSBU - Building Final | Passed |