Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
06/26/2024
Applicant:
Description:
VC 1262-130

Permit Reviews

Permit Number - TC-MDP-0524-00590
Permit Status: Issued
Permit Description: VC 1262-130
Start Date Submittal Complete Date Status  
06/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00590
Permit Status: Issued
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 6
Date Name
05/02/2024 Post-Tension Inspection Report is required.
05/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00590
Permit Status: Issued
Permit Description: VC 1262-130
Date Description Comments
07/09/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0524-00590
Permite Description: VC 1262-130
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
07/22/2024 COT - RSBU - Preslab N/A Re-inspection required 7/22/24: missing wrap on plumbing.
10/03/2024 COT - BULD - SWG Clearance N/A Canceled Canceled by contractor
COT - RSEL - Electrical Final N/A Requested
COT - RSEL - Outdoor Lighting N/A Requested
COT - RSME - Mechanical Final N/A Requested
COT - RSPL - Plumbing Final N/A Requested
ENGR Engineering Final N/A Requested
RSBU - Building Final N/A Requested
RSBU - Building Progress N/A Requested

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0524-00590
Permit Description: VC 1262-130
Total Completed Inspections - 14
Date Description Inspector Results Comments
07/17/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 7/17/2024
07/17/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 7/17/2024
07/17/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 7/17/2024
07/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/22/2024 COT - RSEL - Electrical Underground Passed
07/22/2024 COT - RSEL - Grounding/Bonding Passed
07/23/2024 COT - RSBU - Preslab Passed
08/07/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/07/2024 COT - RSBU - Roof Nailing Passed
09/03/2024 COT - RSPL - Gas Pressure Test Passed
09/03/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. 9/3/2024
09/05/2024 COT - RSBU - Interior Shear Bracing Passed
09/13/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/13/2024
11/05/2024 COT - BULD - SWG Clearance Passed 11-5-24, sediment trap on water heater together with shutoff valves verified in place at appliances. Okay for Southwest Gas connection.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESERVES AT VALENCIA CROSSING - LOT 4 START_V1.PDF DOCUMENTS VIEW
RVC 4 SIC-2024-06-26_V1.PDF DOCUMENTS VIEW