Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/02/2024
Applicant:
Description:
VC 1262-130

Permit Reviews

Permit Number - TC-MDP-0524-00589
Permit Status: Inspections complete
Permit Description: VC 1262-130
Start Date Submittal Complete Date Status  
06/21/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 06/24/2024 APPROVED Review Details
06/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/14/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00589
Permit Status: Inspections complete
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 6
Date Name
05/02/2024 Post-Tension Inspection Report is required.
05/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
06/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0524-00589
Permit Status: Inspections complete
Permit Description: VC 1262-130
Date Description Comments
05/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00589
Permit Description: VC 1262-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/05/2024 COT - RSPL - Rough Soil Passed
07/05/2024 COT - RSPL - Sewer Passed
07/17/2024 COT - RSBU - Preslab Passed
07/17/2024 COT - RSEL - Electrical Underground Passed
07/17/2024 COT - RSEL - Grounding/Bonding Passed
07/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/13/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/13/2024 COT - RSBU - Roof Nailing Passed
08/30/2024 COT - RSPL - Yard Water Line Passed
09/03/2024 COT - RSPL - Gas Pressure Test Passed
09/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 9/4/2024
09/13/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/13/2024
10/03/2024 COT - RSBU - Interior Shear Bracing Passed PASSED SHEER WALL BRACING 10/3/2024
10/16/2024 COT - BULD - SWG Clearance Passed PASSED SW GAS CLEARANCE 10/16/24
11/20/2024 ENGR Engineering Final Passed CO Ready
11/25/2024 COT - RSEL - Electrical Final Passed 11-25-24, electrical, mechanical,plumbing, outdoor lighting and building finals all approved.
11/25/2024 COT - RSEL - Outdoor Lighting Passed 11-25-24, electrical, mechanical,plumbing, outdoor lighting and building finals all approved.
11/25/2024 COT - RSME - Mechanical Final Passed 11-25-24, electrical, mechanical,plumbing, outdoor lighting and building finals all approved.
11/25/2024 COT - RSPL - Plumbing Final Passed 11-25-24, electrical, mechanical,plumbing, outdoor lighting and building finals all approved.
11/25/2024 RSBU - Building Final Passed 11-25-24, electrical, mechanical,plumbing, outdoor lighting and building finals all approved.
11/25/2024 RSBU - Building Progress Passed 11-25-24, electrical, mechanical,plumbing, outdoor lighting and building finals all approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RESERVES AT VALENCIA CROSSING - LOT 2 START_V2.PDF DOCUMENTS VIEW
RVC 2 SIC- REVISED-2024-06-18_V2.PDF DOCUMENTS VIEW