Permit: TC-MDP-0524-00583
Permit Details
Apply Date:
05/02/2024
Applicant:
Description:
VC 1262-130
Permit Reviews
Permit Number - TC-MDP-0524-00583
Permit Status: Inspections complete
Permit Description: VC 1262-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00583
Permit Status: Inspections complete
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
05/02/2024 | Post-Tension Inspection Report is required. |
05/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
05/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0524-00583
Permit Status: Inspections complete
Permit Description: VC 1262-130
Date | Description | Comments |
---|---|---|
05/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00583
Permit Description: VC 1262-130
Total Completed Inspections - 21