Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0524-00564
Permit Details
Apply Date:
05/01/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30A Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00564
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/19/2024 | APPROVED |
05/02/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00564
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00564
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan
Date | Description | Comments |
---|---|---|
05/13/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
05/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/01/2024 | Post-Tension Inspection Report is required. | |
05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/08/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
05/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00564
Permit Description: Blackhawk H30A Model Plan
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/08/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 7/8/2024 | |
07/08/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 7/8/2024 | |
07/08/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 7/8/2024 | |
07/16/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/16/2024 | |
07/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/16/2024 | COT - RSBU - Preslab | Passed | ||
07/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 8/9/2024 | |
08/09/2024 | COT - RSBU - Roof Nailing | Passed | Corrections were made. 8/9/2024 | |
09/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections were made. 9/18/2024 | |
09/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | PASS 9/26/2024 | |
11/05/2024 | COT - BULD - SWG Clearance | Passed | 11-5-24, sediment trap on water heater together with shutoff valves on appliances verified. Okay for Southwest Gas connection. | |
11/08/2024 | COT - RSEL - Electrical Final | Passed | Passed | |
11/08/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed | |
11/08/2024 | COT - RSME - Mechanical Final | Passed | Passed | |
11/08/2024 | COT - RSPL - Plumbing Final | Passed | Passed | |
11/08/2024 | RSBU - Building Final | Passed | Passed | |
11/08/2024 | RSBU - Building Progress | Passed | Passed | |
11/13/2024 | ENGR Engineering Final | Passed | CO Ready |