Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/01/2024
Applicant:
Kelly Rayman
Description:
Blackhawk H30M Model Plan

Permit Reviews

Permit Number - TC-MDP-0524-00560
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan
Start Date Submittal Complete Date Status  
05/02/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/10/2024 APPROVED Review Details
09/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00560
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan
Total Outstanding Activity Conditions - 1
Date Name
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0524-00560
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan
Date Description Comments
05/10/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/08/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00560
Permit Description: Blackhawk H30M Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/08/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 7/8/2024
07/08/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 7/8/2024
07/08/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 7/8/2024
07/12/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/12/2024
07/12/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/12/2024 COT - RSBU - Preslab Passed
07/12/2024 COT - RSEL - Electrical Underground Passed
07/12/2024 COT - RSEL - Grounding/Bonding Passed
08/01/2024 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 8/1/2024
08/01/2024 COT - RSBU - Roof Nailing Passed Corrections were made. 8/1/2024
08/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/08/2024 COT - RSPL - Gas Pressure Test Passed
08/13/2024 COT - RSBU - Interior Shear Bracing Passed
09/13/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 9/13/2024
09/19/2024 COT - RSEL - Outdoor Lighting Passed
09/19/2024 COT - RSME - Mechanical Final Passed
09/19/2024 ENGR Engineering Final Passed CO Ready
09/19/2024 RSBU - Building Progress Passed
09/23/2024 COT - RSEL - Electrical Final Passed passed. 9/23/24
09/23/2024 COT - RSPL - Plumbing Final Passed plumbing fixed at kitchen sink, passed. 9/23/24
09/23/2024 RSBU - Building Final Passed passed 9/23/24

Documents

File Name Document Type  
BHK 127 SIC-2024-09-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 127 D1_V1.PDF DOCUMENTS VIEW
BHK 127 SIC-2024-05-01_V1.PDF DOCUMENTS VIEW