Permit: TC-MDP-0524-00557
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6097 E FALCONRY TR
Address NEW:
6097 E FALCONRY TR
Apply Date:
05/01/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-0524-00557
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/12/2025 | APPROVED |
| 06/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/10/2025 | REQUIRES RESUBMIT |
| 05/02/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00557
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00557
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
| Date | Description | Comments |
|---|---|---|
| 05/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/07/2024 | Post-Tension Inspection Report is required. | |
| 05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/07/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00557
Permite Description: Blackhawk H30K Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | 5/5/25: not ready |
| 05/05/2025 | COT - RSBU - Preslab | N/A | Not Ready | 5/5/25: not ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00557
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2025 | BULD - Electrical Clearance | Passed | 4-25-25, panel is okay for it to be energized. ECO clearance issued to TEP. | |
| 04/25/2025 | COT - RSPL - Rough Soil | Passed | 4-25-25, underground plumbing verified as per plans. Okay to backfill-shading required. | |
| 04/25/2025 | COT - RSPL - Sewer | Passed | 4-25-25, sewer connection approved. Okay to backfill-shading required. | |
| 04/25/2025 | COT - RSPL - Yard Water Line | Passed | 4-25-25, main water line & underground plumbing verified as per plans. Okay to backfill-shading required. | |
| 05/05/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/05/2025 | COT - RSBU - Preslab | Passed | ||
| 05/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/13/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/23/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/23/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 5/23/25 | |
| 05/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5-28-25, intermediates approved. | |
| 05/28/2025 | COT - RSEL - Electrical Underground | Passed | 5-28-25, approved. | |
| 06/04/2025 | COT - RSBU - Interior Shear Bracing | Passed | 6-4-25: interior shear wall approved. Okay to tape and texture. | |
| 08/01/2025 | COT - BULD - SWG Clearance | Passed | Approved, SWG Clearance is required for the meter set | |
| 09/18/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/18/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 09/18/2025 | ENGR Engineering Final | Passed | Site is clean and accessible, built in accordance with approved plans. | |
| 09/18/2025 | RSBU - Building Progress | Passed | ||
| 09/19/2025 | COT - RSEL - Electrical Final | Passed | 9-19-25: electrical final approved. | |
| 09/19/2025 | COT - RSME - Mechanical Final | Passed | 9-19-25: intermediates approved. | |
| 09/22/2025 | RSBU - Building Final | Passed |