Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6097 E FALCONRY TR
Apply Date:
05/01/2024
Applicant:
Alonzo Martinez
Description:
Blackhawk H30K Model Plan

Permit Reviews

Permit Number - TC-MDP-0524-00557
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Start Date Submittal Complete Date Status  
06/11/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/12/2025 APPROVED Review Details
06/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2025 REQUIRES RESUBMIT Review Details
05/02/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/10/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0524-00557
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 1
Date Name
05/01/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0524-00557
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
Date Description Comments
05/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/07/2024 Post-Tension Inspection Report is required.
05/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00557
Permite Description: Blackhawk H30K Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/05/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready 5/5/25: not ready
05/05/2025 COT - RSBU - Preslab N/A Not Ready 5/5/25: not ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0524-00557
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/25/2025 BULD - Electrical Clearance Passed 4-25-25, panel is okay for it to be energized. ECO clearance issued to TEP.
04/25/2025 COT - RSPL - Rough Soil Passed 4-25-25, underground plumbing verified as per plans. Okay to backfill-shading required.
04/25/2025 COT - RSPL - Sewer Passed 4-25-25, sewer connection approved. Okay to backfill-shading required.
04/25/2025 COT - RSPL - Yard Water Line Passed 4-25-25, main water line & underground plumbing verified as per plans. Okay to backfill-shading required.
05/05/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
05/05/2025 COT - RSBU - Preslab Passed
05/13/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/13/2025 COT - RSBU - Roof Nailing Passed
05/23/2025 COT - RSEL - Grounding/Bonding Passed
05/23/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/23/25
05/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-28-25, intermediates approved.
05/28/2025 COT - RSEL - Electrical Underground Passed 5-28-25, approved.
06/04/2025 COT - RSBU - Interior Shear Bracing Passed 6-4-25: interior shear wall approved. Okay to tape and texture.
08/01/2025 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the meter set
09/18/2025 COT - RSEL - Outdoor Lighting Passed
09/18/2025 COT - RSPL - Plumbing Final Passed
09/18/2025 ENGR Engineering Final Passed Site is clean and accessible, built in accordance with approved plans.
09/18/2025 RSBU - Building Progress Passed
09/19/2025 COT - RSEL - Electrical Final Passed 9-19-25: electrical final approved.
09/19/2025 COT - RSME - Mechanical Final Passed 9-19-25: intermediates approved.
09/22/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
BHK 131 SIC-2025-06-10_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 131 D1_V1.PDF DOCUMENTS VIEW
BHK 131 SIC-2024-05-01_V1.PDF DOCUMENTS VIEW