Permit: TC-MDP-0524-00551
Permit Details
Apply Date:
08/09/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502320 T21-M0070 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0524-00551
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/08/2024 | APPROVED |
08/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0524-00551
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/01/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0524-00551
Permit Status: Issued
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Date | Description | Comments |
---|---|---|
08/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/19/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/19/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/19/2024 | Post-Tension Inspection Report is required. | |
05/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00551
Permite Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 1-MASA straps have more than one in three legs up. 2-Back columns are not secured to concrete. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0524-00551
Permit Description: SFR MER1502320 T21-M0070 REV1 roof covering change
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/04/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is installed and connected to main water supply line and is under street pressure. | |
09/04/2024 | COT - RSPL - Sewer | Passed | ||
09/04/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line and fully under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
09/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
09/11/2024 | COT - RSBU - Preslab | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed | ||
09/13/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/13/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
09/28/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/03/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/21/2024 | BULD - Electrical Clearance | Passed | ||
10/21/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
11/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11/20/24; Letter has been sent to city from architect about electrical wiring. Okay to proceed at own risk hoping electrical is approved | |
12/11/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12-11-24, interior shear bracing approved plans prior. okay to tape and texture |