Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/29/2023
Applicant:
Erin Dick
Description:
Building A two-story, 16 unit, apartment building model plans.

Permit Reviews

Permit Number - TC-MDP-0523-01100
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date Submittal Complete Date Status  
06/29/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
12/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/10/2024 APPROVED Review Details
07/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/08/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01100
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 2
Date Name
12/10/2024 AIR BALANCING REPORT IS REQUIRED.
12/10/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-MDP-0523-01100
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date Description Comments
12/10/2024 COMMISSIONING REPORT IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01100
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
05/17/2024 COT - LCPL - Yard Water Line N/A Canceled
07/11/2024 COT - LCBU - Roof Nailing N/A Partial Pass 7/11/24: 2nd floor decking per schedule ok to proceed.
12/10/2024 COT - LCPL - Gas Pressure Test N/A Not Applicable
12/10/2024 COT - LCPL - Plumbing Above Ceiling N/A Not Applicable 12/10/24: not ready
12/10/2024 COT - LCBU - Building Above Ceiling N/A Not Ready 12/10/24: not ready
12/10/2024 COT - LCEL - Electrical Above Ceiling N/A Not Ready 12/10/24: not ready
12/10/2024 COT - LCME - Mechanical Above Ceiling N/A Not Ready 12/10/24: not ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01100
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 19
Date Description Inspector Results Comments
11/27/2023 COT - LCPL - Rough Soil Passed
03/25/2024 COT - LCEL - Grounding/Bonding Passed
03/25/2024 COT - LCBU - Preslab Passed 3/25/24: ok to proceed.
03/25/2024 COT - LCBU - Excavation/Rebar/Zoning Passed 3/25/24: passed ok to proceed.
04/03/2024 COT - LCEL - Electrical Underground Passed
04/24/2024 COT - LCPL - Sewer Passed 7/24/24: ok to backfill
06/04/2024 COT - LCPL - Yard Water Line Passed 3/25/24: partial pass 15' run pending point of connection to back flow preventer and main.
6/4/24: connection to main and back flow preventer made. Ok to backfill shading required
08/26/2024 COT - LCBU - Roof Nailing Passed
09/05/2024 COT - BULD - SWG Clearance Passed
09/06/2024 COT - LCBU - Exterior Clips/Sheathing Passed 2nd floor approved. 9/6/2024
12/12/2024 COT - LCBU - Building Above Ceiling Passed
12/12/2024 COT - LCEL - Electrical Above Ceiling Passed
12/12/2024 COT - LCME - Mechanical Above Ceiling Passed
12/17/2024 COT - LCEL - Electrical Intermediate Passed
12/17/2024 COT - LCBU - Framing Passed
12/17/2024 COT - LCPL - Plumbing Intermediate Passed
12/17/2024 COT - LCME - Mechanical Intermediate Passed
01/16/2025 COT - HCBU - Interior Shear Bracing Passed
02/25/2025 BULD - Electrical Clearance Passed 2-25-25, units 16107, 16106, 16105, 16208, 16207, 16108, 16206, 16205, 16203, 16201, hp16, ev16, 16103, 16104, 16204, 16101, 16202, 16102 approved for panels to be energized. ECO clearance issued to TEP.

Documents

File Name Document Type  
EES_241205_SIC_FINAL_BLDG16_REPORT-2024-12-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDING_16_SPECIAL INSPECTION CERT-2023-06-22_V1.PDF DOCUMENTS VIEW
EES_230620_ SITE PLANS (BLDG 16)_V1.PDF DOCUMENTS VIEW