Permit: TC-MDP-0523-01097
Permit Details
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building A two-story, 16 unit, apartment building model plans.
Permit Reviews
Permit Number - TC-MDP-0523-01097
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 12/10/2024 | APPROVED |
09/30/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 09/30/2024 | REQUIRES RESUBMIT |
06/29/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2024 | REQUIRES RESUBMIT |
09/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/27/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0523-01097
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date | Description | Comments |
---|---|---|
07/24/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
09/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
07/24/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01097
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 10
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 1/31/24: Preslab passed, pending breezeway, |
01/31/2024 | COT - LCBU - Preslab | N/A | Partial Pass | 1/31/24: Preslab passed, pending breezeway, |
01/19/2024 | COT - LCPL - Yard Water Line | N/A | Partial Pass | 1/19/24: YWL 15' Copper pipe per plan under pressure ok to backfill. Pending connection to back flow preventer and main. |
01/31/2024 | COT - LCEL - Electrical Underground | N/A | Partial Pass | 1/31/24: electrical underground at slab passed ok to proceed. |
09/10/2024 | COT - LCBU - Building Above Ceiling | N/A | Re-inspection required | |
09/10/2024 | COT - LCEL - Electrical Above Ceiling | N/A | Re-inspection required | |
09/10/2024 | COT - LCPL - Plumbing Above Ceiling | N/A | Re-inspection required | |
09/10/2024 | COT - LCME - Mechanical Above Ceiling | N/A | Re-inspection required | |
09/20/2024 | COT - LCME - Mechanical Final | N/A | Not Ready | |
11/25/2024 | BULD - Electrical Clearance | N/A | Not Ready | 11/25/24: Not ready (missing breakers, loose grounds, risers need to be properly supported, damaged sheathing must be corrected) |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01097
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 20