Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building A two-story, 16 unit, apartment building model plans.

Permit Reviews

Permit Number - TC-MDP-0523-01093
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date Submittal Complete Date Status  
06/28/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
08/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/01/2024 APPROVED Review Details
07/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01093
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 3
Date Name
09/01/2024 AIR BALANCING REPORT IS REQUIRED.
09/01/2024 COMMISSIONING REPORT IS REQUIRED.
09/01/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-MDP-0523-01093
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date Description Comments
04/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01093
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 15
Last Inspection Date Description Inspector Results Comments
01/03/2024 COT - LCBU - Preslab N/A Partial Pass 1/3/23: pending breezeway.
01/03/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 1/3/23: pending breezeway.
03/01/2024 COT - LCBU - Exterior Clips/Sheathing N/A Partial Pass 3/1/24: first floor exterior clip and sheathing passed. pending framing inspection
05/17/2024 COT - LCPL - Yard Water Line N/A Canceled
07/31/2024 COT - LCPL - Gas Pressure Test N/A Not Applicable
07/31/2024 COT - LCEL - Electrical Above Ceiling N/A Not Ready 6/12/24: not ready
6/26/24: partial pass at landings and breezeways ok to proceed.
6/4/24: not ready
7/31/24: not ready
07/31/2024 COT - LCME - Mechanical Above Ceiling N/A Not Ready 6/12/24: not ready
6/26/24: partial pass at landings and breezeways ok to proceed.
6/4/24: not ready
7/31/24: not ready
07/31/2024 COT - LCBU - Building Above Ceiling N/A Not Ready 7/31/24: not ready
08/01/2024 COT - BULD - SWG Clearance N/A Not Applicable
03/04/2024 COT - LCBU - Framing N/A Partial Pass 3/4/24: first floor framing per plan ok to proceed.
07/31/2024 COT - LCPL - Plumbing Intermediate N/A Not Ready 6/4/24: not ready
7/31/24: not ready
08/12/2024 COT - LCPL - Plumbing Roof Drains N/A Not Ready 8/12/24: not ready
08/12/2024 COT - LCME - Mechanical Intermediate N/A Partial Pass 8/12/24: Stud at girder trust in three units need to be added.
08/12/2024 COT - LCEL - Electrical Intermediate N/A Partial Pass 8/12/24: second floor passed.
10/17/2024 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01093
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 18
Date Description Inspector Results Comments
09/29/2023 COT - LCPL - Rough Soil Passed
01/03/2024 COT - LCEL - Electrical Underground Passed
01/03/2024 COT - LCEL - Grounding/Bonding Passed
02/15/2024 COT - LCPL - Sewer Passed 2/15/24: HCS connection made and approved. Ok to backfill. Shading required
04/08/2024 COT - LCBU - Roof Nailing Passed
04/10/2024 COT - LCBU - Exterior Clips/Sheathing Passed
06/04/2024 COT - LCPL - Yard Water Line Passed 3/25/24: partial pass 15' run pending point of connection to back flow preventer and main.
6/4/24: connection to main and back flow preventer made. Ok to backfill shading required
08/01/2024 COT - LCEL - Electrical Above Ceiling Passed
08/01/2024 COT - LCME - Mechanical Above Ceiling Passed
08/01/2024 COT - LCBU - Building Above Ceiling Passed
08/01/2024 COT - LCPL - Plumbing Above Ceiling Passed
08/05/2024 COT - LCBU - Framing Passed 3/4/24: first floor framing per plan ok to proceed.
6/12/24: not ready
6/26/24: partial pass at landings and breezeways ok to proceed.
6/4/24: not ready
7/31/24: not ready
8/5/24: first floor passed.
08/05/2024 COT - LCPL - Plumbing Intermediate Passed 3/4/24: first floor framing per plan ok to proceed.
6/12/24: not ready
6/26/24: partial pass at landings and breezeways ok to proceed.
6/4/24: not ready
7/31/24: not ready
8/5/24: first floor passed.
08/15/2024 COT - LCPL - Plumbing Roof Drains Passed
08/15/2024 COT - LCME - Mechanical Intermediate Passed
08/15/2024 COT - LCEL - Electrical Intermediate Passed
09/09/2024 COT - HCBU - Interior Shear Bracing Passed
10/31/2024 BULD - Electrical Clearance Passed 10/31/24: TEP ECO CLEARANCE FOR 7355VS WILMOT RD BLDG 7 UNITS 7105,7106,7107,7108,7205,7206,7207,7208,7204,7203,7202,7201,7104,7102,7101,7103, House Panel, Spare,

Documents

File Name Document Type  
EES_240828_SIC_FINAL_BLDG7_COMBINED-2024-08-28_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDING_7_SPECIAL INSPECTION CERT-2023-06-20_V1.PDF DOCUMENTS VIEW
EES_230620_ SITE PLANS (BLDG 7)_V1.PDF DOCUMENTS VIEW