Permit Details

Status:
Needs Resubmittal
Type:
Model Building Permit
Apply Date:
05/29/2023
Applicant:
Erin Dick
Description:
Building A two-story, 16 unit, apartment building model plans.

Permit Reviews

Permit Number - TC-MDP-0523-01092
Permit Status: Needs resubmittal
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date Submittal Complete Date Status  
06/28/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
07/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/02/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01092
Permit Status: Needs resubmittal
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 6
Date Name
04/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/24/2023 WATER STERILIZATION REPORT IS REQUIRED.
09/17/2024 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-MDP-0523-01092
Permit Status: Needs resubmittal
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date Description Comments
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Needs Resubmittal
Permit Number: TC-MDP-0523-01092
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/10/2023 COT - LCPL - Rough Soil Passed
01/11/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
01/11/2024 COT - LCBU - Preslab Passed
01/11/2024 COT - LCEL - Electrical Underground Passed
01/11/2024 COT - LCEL - Grounding/Bonding Passed
01/19/2024 COT - LCPL - Sewer Passed 1/19/24: HCS Connection from 2-way cleanout. Passed
05/06/2024 COT - LCBU - Roof Nailing Passed
05/08/2024 COT - LCBU - Exterior Clips/Sheathing Passed
05/17/2024 COT - LCPL - Yard Water Line Passed
08/23/2024 COT - BULD - SWG Clearance Passed
08/23/2024 COT - LCPL - Gas Pressure Test Passed
09/05/2024 COT - LCBU - Building Above Ceiling Passed
09/05/2024 COT - LCEL - Electrical Above Ceiling Passed
09/05/2024 COT - LCEL - Electrical Intermediate Passed 9/5/2024 all 2nd floor approved.
09/05/2024 COT - LCME - Mechanical Above Ceiling Passed
09/05/2024 COT - LCME - Mechanical Intermediate Passed 9/5/2024 all 2nd floor approved.
09/05/2024 COT - LCPL - Plumbing Above Ceiling Passed
09/05/2024 COT - LCPL - Plumbing Intermediate Passed 9/5/2024 all 2nd floor approved.
09/05/2024 COT - LCBU - Framing Passed
09/30/2024 COT - HCBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDING_6_SPECIAL INSPECTION CERT-2023-06-20_V1.PDF DOCUMENTS VIEW
EES_230620_ SITE PLANS (BLDG 6)_V1.PDF DOCUMENTS VIEW