Permit: TC-MDP-0523-01092
Permit Details
Apply Date:
05/29/2023
Applicant:
Erin Dick
Description:
Building A two-story, 16 unit, apartment building model plans.
Permit Reviews
Permit Number - TC-MDP-0523-01092
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
01/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/30/2025 | APPROVED |
02/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/27/2025 | APPROVED |
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/02/2024 | REQUIRES RESUBMIT |
02/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/07/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01092
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date | Description | Comments |
---|---|---|
02/05/2025 | AIR BALANCING REPORT IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
02/05/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01092
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 29
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2023 | COT - LCPL - Rough Soil | Passed | ||
01/11/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
01/11/2024 | COT - LCBU - Preslab | Passed | ||
01/11/2024 | COT - LCEL - Electrical Underground | Passed | ||
01/11/2024 | COT - LCEL - Grounding/Bonding | Passed | ||
01/19/2024 | COT - LCPL - Sewer | Passed | 1/19/24: HCS Connection from 2-way cleanout. Passed | |
05/06/2024 | COT - LCBU - Roof Nailing | Passed | ||
05/08/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
05/17/2024 | COT - LCPL - Yard Water Line | Passed | ||
08/23/2024 | COT - BULD - SWG Clearance | Passed | ||
08/23/2024 | COT - LCPL - Gas Pressure Test | Passed | ||
09/05/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
09/05/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
09/05/2024 | COT - LCEL - Electrical Intermediate | Passed | 9/5/2024 all 2nd floor approved. | |
09/05/2024 | COT - LCME - Mechanical Above Ceiling | Passed | ||
09/05/2024 | COT - LCME - Mechanical Intermediate | Passed | 9/5/2024 all 2nd floor approved. | |
09/05/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
09/05/2024 | COT - LCPL - Plumbing Intermediate | Passed | 9/5/2024 all 2nd floor approved. | |
09/05/2024 | COT - LCBU - Framing | Passed | ||
09/30/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
11/05/2024 | BULD - Electrical Clearance | Passed | 11/5/24: ECO TEP CLEARANCE FOR 7355 S WILMOT RD BLDG 6 ( WEST UNITS: 6208,6207,6205,6206,6105,6106,6108,6107) ( EAST UNITS: 6104,6201,6102,6203,6101,6202,6103,6204,HOUSE PANEL, A/A) | |
01/28/2025 | COT - FCON - Fire - Final | Passed | ||
02/25/2025 | COT - LCBU - Building Final | Passed | 2-25-25, building final for Building 6 approved | |
02/25/2025 | COT - LCEL - Outdoor Lighting | Passed | 2-25-25, units 6101, 6102 ADA, 6202, 6201, 6205, 6203, 6103, 6105-plumbing, outdoor lighting, electrical, mechanical, and building final approved | |
02/25/2025 | COT - LCPL - Plumbing Final | Passed | 2-25-25, units 6101, 6102 ADA, 6202, 6201, 6205, 6203, 6103, 6105-plumbing, outdoor lighting, electrical, mechanical, and building final approved | |
02/25/2025 | COT - LCME - Mechanical Final | Passed | 2-25-25, units 6101, 6102 ADA, 6202, 6201, 6205, 6203, 6103, 6105-plumbing, outdoor lighting, electrical, mechanical, and building final approved | |
02/25/2025 | COT - LCEL - Electrical Final | Passed | 2-25-25, units 6101, 6102 ADA, 6202, 6201, 6205, 6203, 6103, 6105-plumbing, outdoor lighting, electrical, mechanical, and building final approved | |
02/27/2025 | ENGR Engineering Final | Passed | Engineering final is clear. | |
02/27/2025 | TRSP - ROW - Final/Close-Out | Passed | no impact to right of way, job completed |