Permit: TC-MDP-0523-01089
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
701 E CALLE ANTONIA
Address NEW:
701 E CALLE ANTONIA
Apply Date:
05/22/2023
Applicant:
Ramon VALDEZ
Description:
SFR VALD00122 T22-M0013
Permit Reviews
Permit Number - TC-MDP-0523-01089
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 04/17/2024 | APPROVED |
| 03/05/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 03/27/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0523-01089
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
| Date | Description | Comments |
|---|---|---|
| 05/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01089
Permite Description: SFR VALD00122 T22-M0013
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/04/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01089
Permit Description: SFR VALD00122 T22-M0013
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2024 | COT - RSPL - Rough Soil | Passed | 4/22/24: ok to backfill. Shading required. | |
| 04/22/2024 | COT - RSPL - Sewer | Passed | 4/22/24: ok to backfill. Shading required. | |
| 04/22/2024 | COT - RSPL - Yard Water Line | Passed | 4/22/24: ok to backfill. Shading required. | |
| 04/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/24/2024 | COT - RSBU - Preslab | Passed | ||
| 04/24/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/28/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/28/24: passed. Ok to proceed | |
| 05/28/2024 | COT - RSBU - Roof Nailing | Passed | 5/28/24: passed. Ok to proceed | |
| 05/30/2024 | BULD - Electrical Clearance | Passed | 5/30/24: ECO TEP clearance | |
| 05/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/04/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/05/2024 | ENGR Engineering Final | Passed | ||
| 09/04/2024 | RSBU - Building Progress | Passed | ||
| 09/06/2024 | COT - RSME - Mechanical Final | Passed | 9/4/2024: Fully insulate and wrap hose bib, weather stripping required to be fixed at water heater room, A/C not working, provide ladder for attic access, 9/6/24: corrections made. Ok for CofO |
|
| 09/06/2024 | RSBU - Building Final | Passed | 9/4/2024: Fully insulate and wrap hose bib, weather stripping required to be fixed at water heater room, A/C not working, provide ladder for attic access, 9/6/24: corrections made. Ok for CofO |
|
| 09/06/2024 | COT - RSEL - Outdoor Lighting | Passed | 9/4/2024: Fully insulate and wrap hose bib, weather stripping required to be fixed at water heater room, A/C not working, provide ladder for attic access, 9/6/24: corrections made. Ok for CofO |
|
| 09/06/2024 | COT - RSPL - Plumbing Final | Passed | 9/4/2024: Fully insulate and wrap hose bib, weather stripping required to be fixed at water heater room, A/C not working, provide ladder for attic access, 9/6/24: corrections made. Ok for CofO |
|
| 09/06/2024 | COT - RSEL - Electrical Final | Passed | 9/4/2024: Fully insulate and wrap hose bib, weather stripping required to be fixed at water heater room, A/C not working, provide ladder for attic access, 9/6/24: corrections made. Ok for CofO |