Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/09/2024
Applicant:
Ramon VALDEZ
Description:
SFR VALD00122 T22-M0013

Permit Reviews

Permit Number - TC-MDP-0523-01088
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
Start Date Submittal Complete Date Status  
04/12/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 04/25/2024 REQUIRES RESUBMIT Review Details
05/06/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 05/17/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01088
Permit Status: Complete
Permit Description: SFR VALD00122 T22-M0013
Date Description Comments
05/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01088
Permite Description: SFR VALD00122 T22-M0013
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/28/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01088
Permit Description: SFR VALD00122 T22-M0013
Total Completed Inspections - 17
Date Description Inspector Results Comments
05/23/2024 COT - RSPL - Rough Soil Passed
05/23/2024 COT - RSPL - Sewer Passed
05/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/28/2024 COT - RSBU - Preslab Passed
06/10/2024 COT - RSBU - Exterior Clips/Sheathing Passed
06/10/2024 COT - RSBU - Roof Nailing Passed
06/14/2024 BULD - Electrical Clearance Passed 6/14/24: Breakers and temporary receptacle have been installed. Issuing an ECO Clearance to TEP to energize electrical panel.
06/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/14/24: All top plate penetrations for electrical, plumbing, and mechanical have been fire foamed. Okay to proceed with installation of insulation and drywall.
08/16/2024 COT - RSBU - Interior Shear Bracing Passed
08/16/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans and meets city requirements.
08/16/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 COT - RSPL - Yard Water Line Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 ENGR Engineering Final Passed
08/16/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.
08/16/2024 RSBU - Building Progress Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. GFCI outlets in bathrooms are fully operational. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TRUEB.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CALLE MARIA_V1.PDF DOCUMENTS VIEW