Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1881 S POETRY LN
Apply Date:
08/25/2023
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050

Permit Reviews

Permit Number - TC-MDP-0523-01086
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date Submittal Complete Date Status  
11/17/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/17/2023 APPROVED Review Details
08/25/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 08/30/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01086
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date Description Comments
01/03/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/28/2023 Post-Tension Inspection Report is required.
05/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01086
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/16/2024 COT - RSPL - Gas Pressure Test N/A Not Ready 1/16/24: not ready
01/29/2024 COT - RSBU - Firewall/Fire Barrier/Firestop N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01086
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/03/2023 COT - RSPL - Backwater Valve Passed
10/03/2023 COT - RSPL - Rough Soil Passed 10/3/23: ok to backfill plumbing per plan (shading required)
10/03/2023 COT - RSPL - Sewer Passed
10/03/2023 COT - RSPL - Yard Water Line Passed
10/12/2023 COT - RSEL - Grounding/Bonding Passed
10/12/2023 COT - RSEL - Electrical Underground Passed
10/12/2023 COT - RSBU - Preslab Passed
10/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/07/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/07/2023 COT - RSBU - Roof Nailing Passed
01/16/2024 BULD - Electrical Clearance Passed 1/16/24: ECO
01/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/18/2024 COT - RSPL - Gas Pressure Test Passed
01/29/2024 COT - RSBU - Interior Shear Bracing Passed
02/07/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed Drywall for fire walls is properly installed and screwed per plans. Okay to proceed with tape and texture of all walls and ceiling.
03/26/2024 COT - BULD - SWG Clearance Passed
04/05/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them.
04/05/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans.
04/05/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them.
04/05/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them.
04/05/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them.
04/05/2024 RSBU - Building Progress Passed Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them.
04/10/2024 ENGR Engineering Final Passed Again, please have address posted prior to calling for inspection

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 48-2023-11-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 48 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 48 PT CERT-2023-08-25_V1.PDF DOCUMENTS VIEW