Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01086
Permit Details
Apply Date:
08/25/2023
Applicant:
Stephanie Bebee
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - TC-MDP-0523-01086
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/17/2023 | APPROVED |
08/25/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/30/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01086
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
01/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/28/2023 | Post-Tension Inspection Report is required. | |
05/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/28/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01086
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | 1/16/24: not ready |
01/29/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01086
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2023 | COT - RSPL - Backwater Valve | Passed | ||
10/03/2023 | COT - RSPL - Rough Soil | Passed | 10/3/23: ok to backfill plumbing per plan (shading required) | |
10/03/2023 | COT - RSPL - Sewer | Passed | ||
10/03/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/12/2023 | COT - RSBU - Preslab | Passed | ||
10/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/16/2024 | BULD - Electrical Clearance | Passed | 1/16/24: ECO | |
01/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
01/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/07/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Drywall for fire walls is properly installed and screwed per plans. Okay to proceed with tape and texture of all walls and ceiling. | |
03/26/2024 | COT - BULD - SWG Clearance | Passed | ||
04/05/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans. | |
04/05/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/05/2024 | RSBU - Building Progress | Passed | Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in garage, kitchen, bathrooms, and exterior of house. AFCI breakers are installed in electrical panel. Okay to issue Certificate of Occupancy after all other departments complete their inspections and pass them. | |
04/10/2024 | ENGR Engineering Final | Passed | Again, please have address posted prior to calling for inspection |