Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01084
Permit Details
Apply Date:
05/25/2023
Applicant:
Mark Alteri
Description:
SFR PVCS1041 T22-M0050
Permit Reviews
Permit Number - TC-MDP-0523-01084
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
05/26/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/13/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01084
Permit Status: Complete
Permit Description: SFR PVCS1041 T22-M0050
Date | Description | Comments |
---|---|---|
01/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/17/2023 | Post-Tension Inspection Report is required. | |
05/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01084
Permite Description: SFR PVCS1041 T22-M0050
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2023 | RSBU - Building Progress | N/A | Canceled | Cancelled per Mark Alteri, called in the wrong permit number. |
11/27/2023 | COT - RSEL - Electrical Underground | N/A | Canceled | Cancelled per Mark Alteri, called in the wrong permit number. |
01/23/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1/23/24 missing electrical on island |
01/23/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 1/23/24 missing sink in bathroom |
01/23/2024 | RSBU - Building Final | N/A | Re-inspection required | 1/23/24 missing sink in bathroom, electrical on island |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01084
Permit Description: SFR PVCS1041 T22-M0050
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2023 | COT - RSPL - Backwater Valve | Passed | ||
06/21/2023 | COT - RSPL - Yard Water Line | Passed | ||
06/21/2023 | COT - RSPL - Sewer | Passed | ||
06/21/2023 | COT - RSPL - Rough Soil | Passed | ||
06/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/27/2023 | COT - RSBU - Preslab | Passed | ||
06/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
07/27/2023 | COT - RSBU - Roof Nailing | Passed | ||
07/31/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/05/2023 | BULD - Electrical Clearance | Passed | Approved new service, ECO Clearance to TEP is required 12/22/23 clearance resent |
|
10/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
10/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/13/2023 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls sheet rock installation is per plans. Okay to tape, texture, and paint interior walls. | |
11/13/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | South exterior wall sheet rock is properly installed and screwed off as per plans for the firewall. Okay to tape, texture, and paint walls. | |
01/11/2024 | COT - BULD - SWG Clearance | Passed | 1/11/24: all corrections made | |
01/18/2024 | RSBU - Building Progress | Passed | ||
01/17/2024 | COT - RSEL - Electrical Underground | Passed | 1/17/24: Underground electrical for kitchen island okay. | |
01/23/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
01/23/2024 | COT - RSME - Mechanical Final | Passed | ||
01/23/2024 | ENGR Engineering Final | Passed | ||
01/25/2024 | COT - RSEL - Electrical Final | Passed | ||
01/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
01/26/2024 | RSBU - Building Final | Passed |