Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/28/2023
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR

Permit Reviews

Permit Number - TC-MDP-0523-01082
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date Submittal Complete Date Status  
08/28/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 08/29/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01082
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 5
Date Name
08/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/28/2023 Post-Tension Inspection Report is required.
08/28/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/28/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01082
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Date Description Comments
05/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01082
Permite Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/17/2023 COT - RSPL - Rough Soil N/A Re-inspection required Per previous notes. 10/17/2023
10/17/2023 COT - RSPL - Sewer N/A Re-inspection required Per previous notes. 10/17/2023
10/17/2023 COT - RSPL - Yard Water Line N/A Re-inspection required Per previous notes. 10/17/2023
12/22/2023 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01082
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/18/2023 COT - RSPL - Rough Soil Passed
10/18/2023 COT - RSPL - Sewer Passed
10/18/2023 COT - RSPL - Yard Water Line Passed
10/23/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/23/2023 COT - RSEL - Electrical Underground Passed
10/23/2023 COT - RSBU - Preslab Passed
11/13/2023 COT - RSBU - Roof Nailing Passed
11/15/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/22/2023 COT - RSEL - Grounding/Bonding Passed
12/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/22/2023 BULD - Electrical Clearance Passed
12/22/2023 COT - RSPL - Gas Pressure Test Passed
01/08/2024 COT - RSBU - Interior Shear Bracing Passed
04/01/2024 COT - BULD - SWG Clearance Passed
04/01/2024 COT - RSEL - Electrical Final Passed
04/01/2024 COT - RSEL - Outdoor Lighting Passed
04/01/2024 COT - RSME - Mechanical Final Passed
04/01/2024 COT - RSPL - Plumbing Final Passed
04/01/2024 RSBU - Building Final Passed
04/09/2024 ENGR Engineering Final Passed Grade looks good and seams to be completed as planned.
Builder should be aware that the clean out in front yard could cause a tripping hazard.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 02404 - SIC-2023-08-28_V1.PDF DOCUMENTS VIEW
LE 02404_V1.PDF DOCUMENTS VIEW