Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/16/2023
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR

Permit Reviews

Permit Number - TC-MDP-0523-01081
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date Submittal Complete Date Status  
07/17/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01081
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 4
Date Name
07/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/17/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01081
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Date Description Comments
05/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01081
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/15/2023 COT - RSPL - Sewer Passed
09/15/2023 COT - RSPL - Rough Soil Passed
09/15/2023 COT - RSPL - Yard Water Line Passed
09/22/2023 COT - RSBU - Preslab Passed
09/22/2023 COT - RSEL - Electrical Underground Passed
09/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/17/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/17/2023 COT - RSBU - Roof Nailing Passed
11/16/2023 BULD - Electrical Clearance Passed
11/16/2023 COT - RSEL - Grounding/Bonding Passed
11/16/2023 COT - RSPL - Gas Pressure Test Passed
11/16/2023 RSBU - Building Progress Passed
11/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/06/2023 COT - RSBU - Interior Shear Bracing Passed Interior shear walls are properly installed and screwed per the plans, 4" on the edge and 7" in the field.
02/27/2024 COT - BULD - SWG Clearance Passed
02/27/2024 COT - RSEL - Electrical Final Passed
02/27/2024 COT - RSEL - Outdoor Lighting Passed
02/27/2024 COT - RSME - Mechanical Final Passed
02/27/2024 COT - RSPL - Plumbing Final Passed
02/27/2024 RSBU - Building Final Passed
02/27/2024 ENGR Engineering Final Passed Clean out needs to be cut to grade in the front yard

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 01104 - SIC-2023-07-16_V1.PDF DOCUMENTS VIEW
LE 01104_V1.PDF DOCUMENTS VIEW