Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/02/2023
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR

Permit Reviews

Permit Number - TC-MDP-0523-01080
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date Submittal Complete Date Status  
06/02/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01080
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 4
Date Name
06/02/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/02/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/02/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01080
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Date Description Comments
05/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01080
Permite Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/04/2023 BULD - Electrical Clearance N/A Canceled 12/4/23: Cancelled by Superintendent Lorenzo Sanchez. Electrician has not completed previous inspection comments.
12/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled 12/4/23: Cancelled by Superintendent Lorenzo Sanchez. Electrician has not completed previous inspection comments.
01/23/2024 ENGR Engineering Final N/A Not Ready Wing walls and gate not installed
Sewer cover in driveway not installed
Water from back yard not draining correct
Water from neighbors yard weeping into this yard.
Water is not supposed to be draining from adjacent yards

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01080
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/09/2023 COT - RSPL - Sewer Passed
08/09/2023 COT - RSPL - Rough Soil Passed
08/10/2023 COT - RSPL - Yard Water Line Passed
08/16/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/16/2023 COT - RSEL - Electrical Underground Passed
08/16/2023 COT - RSBU - Preslab Passed
09/19/2023 COT - RSBU - Roof Nailing Passed
09/19/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/25/2023 COT - RSPL - Gas Pressure Test Passed
10/25/2023 RSBU - Building Progress Passed
10/26/2023 COT - RSEL - Grounding/Bonding Passed
11/07/2023 COT - RSBU - Interior Shear Bracing Passed
12/13/2023 BULD - Electrical Clearance Passed 12/22/23 clearance resent
12/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/05/2024 COT - BULD - SWG Clearance Passed
01/29/2024 COT - RSEL - Outdoor Lighting Passed
01/29/2024 COT - RSPL - Plumbing Final Passed
01/31/2024 COT - RSME - Mechanical Final Passed 1/31/24: Outside GFCI is resetting, driveway sewer cap is properly installed, equipment and lights are installed and operational in attic. Construction is complete. Okay to issue C of O, once all other departments sign off.
01/31/2024 COT - RSEL - Electrical Final Passed 1/31/24: Outside GFCI is resetting, driveway sewer cap is properly installed, equipment and lights are installed and operational in attic. Construction is complete. Okay to issue C of O, once all other departments sign off.
01/31/2024 RSBU - Building Final Passed 1/31/24: Outside GFCI is resetting, driveway sewer cap is properly installed, equipment and lights are installed and operational in attic. Construction is complete. Okay to issue C of O, once all other departments sign off.
08/27/2024 ENGR Engineering Final Passed All items have been corrected