Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/23/2023
Applicant:
Andrea Flood
Description:
SFR F60A22 T22-M0028

Permit Reviews

Permit Number - TC-MDP-0523-01072
Permit Status: Inspections complete
Permit Description: SFR F60A22 T22-M0028
Start Date Submittal Complete Date Status  
08/23/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 08/24/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01072
Permit Status: Inspections complete
Permit Description: SFR F60A22 T22-M0028
Total Outstanding Activity Conditions - 6
Date Name
08/23/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/23/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/23/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/23/2023 Post-Tension Inspection Report is required.
08/23/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/23/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01072
Permit Status: Inspections complete
Permit Description: SFR F60A22 T22-M0028
Date Description Comments
05/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01072
Permit Description: SFR F60A22 T22-M0028
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/02/2023 COT - RSPL - Rough Soil Passed 10/2/23 Ok to backfill, verified main is one piece ok to backfill but leave coupling exposed for leaks.
10/02/2023 COT - RSPL - Sewer Passed 10/2/23 Ok to backfill, verified main is one piece ok to backfill but leave coupling exposed for leaks.
10/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/06/2023 COT - RSBU - Preslab Passed
10/06/2023 COT - RSEL - Electrical Underground Passed
10/06/2023 COT - RSEL - Grounding/Bonding Passed
10/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/27/2023 COT - RSBU - Roof Nailing Passed
11/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/28/2023 BULD - Electrical Clearance Passed TEP ECO
11/28/2023 COT - RSPL - Gas Pressure Test Passed
11/28/2023 COT - RSPL - Yard Water Line Passed
12/08/2023 COT - RSBU - Interior Shear Bracing Passed
02/07/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/05/2024 COT - RSEL - Outdoor Lighting Passed
03/05/2024 COT - RSME - Mechanical Final Passed
03/05/2024 COT - RSPL - Plumbing Final Passed
03/05/2024 RSBU - Building Progress Passed
03/05/2024 ENGR Engineering Final Passed Grade cert. passed, no other issues found.
03/06/2024 COT - RSEL - Electrical Final Passed
03/06/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-23_V1.PDF DOCUMENTS VIEW