Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/31/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55C T21-M0085

Permit Reviews

Permit Number - TC-MDP-0523-01068
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Start Date Submittal Complete Date Status  
06/01/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/05/2023 APPROVED Review Details
10/11/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 11/02/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01068
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Total Outstanding Activity Conditions - 5
Date Name
06/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/01/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01068
Permit Status: Inspections complete
Permit Description: SFR RKF55C T21-M0085
Date Description Comments
05/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01068
Permit Description: SFR RKF55C T21-M0085
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/28/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/28/2023 COT - RSPL - Rough Soil Passed
07/28/2023 COT - RSPL - Sewer Passed
07/28/2023 COT - RSPL - Yard Water Line Passed
08/09/2023 COT - RSBU - Preslab Passed
08/09/2023 COT - RSEL - Electrical Underground Passed
08/09/2023 COT - RSEL - Grounding/Bonding Passed
09/06/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 9/6/23 Missed two anchor bolts exterior and one shot nail interior, ok to continue marked in red to verify at intermediate
09/06/2023 COT - RSBU - Roof Nailing Passed
11/16/2023 BULD - Electrical Clearance Passed 11/16/23: TEP ECO
11/16/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/28/2023 COT - RSPL - Gas Pressure Test Passed
12/06/2023 COT - RSBU - Interior Shear Bracing Passed
01/31/2024 COT - BULD - SWG Clearance Passed SWG for meter only
02/26/2024 COT - RSEL - Electrical Final Passed
02/26/2024 COT - RSEL - Outdoor Lighting Passed
02/26/2024 COT - RSPL - Plumbing Final Passed
02/26/2024 RSBU - Building Final Passed
02/26/2024 RSBU - Building Progress Passed
02/26/2024 ENGR Engineering Final Passed
02/26/2024 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_REV_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_REVISION_NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION-2023-05-31_V1.PDF DOCUMENTS VIEW