Permit: TC-MDP-0523-01066
Permit Details
Apply Date:
05/23/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0523-01066
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/08/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 06/09/2023 | APPROVED |
05/24/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/05/2023 | REQUIRES RESUBMIT |
06/09/2023 | RESTAMP - RESIDENTIAL v.1 | 06/12/2023 | APPROVED |
08/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01066
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
05/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/24/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
05/24/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01066
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2023 | COT - RSPL - Rough Soil | Passed | ||
08/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
08/17/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/17/2023 | COT - RSBU - Preslab | Passed | ||
08/17/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/17/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/14/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/14/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/13/2023 | BULD - Electrical Clearance | Passed | ||
11/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/29/2023 | COT - RSPL - Sewer | Passed | ||
12/06/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/01/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
02/26/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | COT - RSEL - Outdoor Lighting | Passed | Exterior lights are installed per plans and are operational. | |
02/26/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve is installed in between 2 way clean out. | |
02/26/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
03/07/2024 | ENGR Engineering Final | Passed | landscaping trees not properly staked, move wire supports higher up tree, no grade cert., remove nursery stakes from trees in backyard. |