Permit: TC-MDP-0523-01065
Permit Details
Apply Date:
06/27/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0523-01065
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/22/2024 | APPROVED |
06/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/03/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01065
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
06/28/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/22/2024 | Post-Tension Inspection Report is required. | |
06/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/22/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
06/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/22/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
06/28/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01065
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2023 | COT - RSPL - Yard Water Line | Passed | Okay to backfill shading is required. 10/2/2023 | |
10/03/2023 | COT - RSPL - Backwater Valve | Passed | Not ready. Shower line is calling for 2" and 1" 1/2 is installed. Plumbing not per plan. 10/2/2023 10/3/23: corrections made |
|
10/03/2023 | COT - RSPL - Rough Soil | Passed | Not ready. Shower line is calling for 2" and 1" 1/2 is installed. Plumbing not per plan. 10/2/2023 10/3/23: corrections made |
|
10/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/06/2023 | COT - RSBU - Preslab | Passed | ||
10/06/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/06/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/27/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/27/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/30/2023 | COT - RSPL - Sewer | Passed | ||
01/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/04/2024 | BULD - Electrical Clearance | Passed | ||
01/04/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
01/19/2024 | COT - RSBU - Interior Shear Bracing | Passed | 1/19/24: Interior shear walls are properly installed and screwed off. Okay to proceed with tape and texture. | |
03/11/2024 | COT - BULD - SWG Clearance | Passed | ||
03/21/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
03/21/2024 | COT - RSME - Mechanical Final | Passed | ||
03/21/2024 | RSBU - Building Progress | Passed | ||
03/21/2024 | RSBU - Building Final | Passed | ||
03/21/2024 | COT - RSPL - Plumbing Final | Passed | ||
03/21/2024 | COT - RSEL - Electrical Final | Passed | ||
07/05/2024 | ENGR Engineering Final | Passed |