Permit: TC-MDP-0523-01059
Permit Details
Apply Date:
05/23/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0523-01059
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/24/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/05/2023 | APPROVED |
08/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01059
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
05/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/24/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/19/2024 | Post-Tension Inspection Report is required. | |
05/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
05/24/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/05/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01059
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2023 | COT - RSPL - Rough Soil | Passed | ||
08/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
08/15/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/15/2023 | COT - RSBU - Preslab | Passed | ||
08/15/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/15/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/06/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/11/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 9/11/2023 | |
11/01/2023 | BULD - Electrical Clearance | Passed | 11/1/23: TEP ECO | |
11/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/01/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/21/2023 | COT - RSPL - Sewer | Passed | ||
11/24/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/17/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed on water heater, dryer, and kitchen stove. Okay to install meter and turn on gas. | |
02/26/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | COT - RSEL - Outdoor Lighting | Passed | Exterior lights are installed per plans and are operational. | |
02/26/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are fully operational. Electrical panel is equipped with AFCI & GFCI Breakers. Water heater is installed and functional. Light in attic is working. Gas is turned on and working on the stove. Okay to issue Certificate of Occupancy. | |
02/26/2024 | RSBU - Building Progress | Passed | ||
02/26/2024 | ENGR Engineering Final | Passed | landscaping not properly staked and nursery stakes still in place. |