Permit: TC-MDP-0523-01055
Permit Details
Apply Date:
09/18/2023
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN3 T22-M0044
Permit Reviews
Permit Number - TC-MDP-0523-01055
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/29/2023 | APPROVED |
09/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/20/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01055
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date | Description | Comments |
---|---|---|
09/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/20/2023 | Post-Tension Inspection Report is required. | |
05/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01055
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | COT - RSPL - Sewer | Passed | ||
10/09/2023 | COT - RSPL - Rough Soil | Passed | ||
10/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/12/2023 | COT - RSBU - Preslab | Passed | ||
10/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/13/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior shear wall sheathing is properly nailed off, anchor bolts are installed in load bearing walls with proper plate washers. Okay to proceed with rough-in of other trades and stucco installation. | |
11/13/2023 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly nailed off, H2.5 clips are attached to all exterior wall rafters, TJI joists hangers are properly attached to ledger board and nailed off. Okay to proceed with drying in of roof. | |
01/17/2024 | BULD - Electrical Clearance | Passed | TEP ECO CLEARANCE ISSUED | |
02/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/02/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
03/04/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and screwed off. Okay to proceed with tape, texture, and paint. | |
04/26/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
05/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/08/2024 | COT - RSME - Mechanical Final | Passed | ||
05/08/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/08/2024 | RSBU - Building Progress | Passed | ||
05/09/2024 | ENGR Engineering Final | Passed | ||
05/10/2024 | COT - RSEL - Electrical Final | Passed | ||
05/10/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/10/2024 | RSBU - Building Final | Passed |