Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/01/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - TC-MDP-0523-01054
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
06/02/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/06/2023 APPROVED Review Details
09/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/21/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01054
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
06/02/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/21/2023 Post-Tension Inspection Report is required.
05/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/21/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01054
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 23
Date Description Inspector Results Comments
06/26/2023 COT - RSPL - Yard Water Line Passed
06/26/2023 COT - RSPL - Sewer Passed
06/26/2023 COT - RSPL - Rough Soil Passed
06/26/2023 COT - RSPL - Backwater Valve Passed
06/30/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
06/30/2023 COT - RSBU - Preslab Passed
06/30/2023 COT - RSEL - Grounding/Bonding Passed
06/30/2023 COT - RSEL - Electrical Underground Passed
08/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed Rafter clips are in place and properly nailed off. Shear walls are properly nailed off.
08/14/2023 COT - RSBU - Roof Nailing Passed Roof is properly nailed off. Okay to dry in roof.
09/20/2023 BULD - Electrical Clearance Passed TEP ECO
10/10/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/10/2023 COT - RSPL - Gas Pressure Test Passed
10/31/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
10/31/2023 COT - RSBU - Interior Shear Bracing Passed
01/09/2024 ENGR Engineering Final Passed
01/11/2024 COT - BULD - SWG Clearance Passed SWG for meter connection
01/11/2024 COT - RSEL - Electrical Final Passed
01/11/2024 COT - RSEL - Outdoor Lighting Passed
01/11/2024 COT - RSME - Mechanical Final Passed
01/11/2024 COT - RSPL - Plumbing Final Passed
01/11/2024 RSBU - Building Final Passed
01/11/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 18-2023-09-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 18 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 18 PT CERT-2023-06-01_V1.PDF DOCUMENTS VIEW