Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/23/2023
Applicant:
David Martin
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-0523-01053
Permit Status: Complete
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
06/28/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/03/2023 APPROVED Review Details
10/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/27/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01053
Permit Status: Complete
Permit Description: SFR K35I T21-M0034
Date Description Comments
06/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/19/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
06/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01053
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/15/2023 COT - RSPL - Rough Soil Passed Approved. Okay to backfill. Shading required. 8/15/2023
08/15/2023 COT - RSPL - Sewer Passed Approved. Okay to backfill. Shading required. 8/15/2023
08/15/2023 COT - RSPL - Yard Water Line Passed Approved. Okay to backfill. Shading required. 8/15/2023
08/23/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/23/2023 COT - RSBU - Preslab Passed
08/23/2023 COT - RSEL - Electrical Underground Passed
08/24/2023 COT - RSEL - Grounding/Bonding Passed
09/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/18/2023 COT - RSBU - Roof Nailing Passed
10/20/2023 BULD - Electrical Clearance Passed TEP ECO
10/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/20/2023 COT - RSPL - Gas Pressure Test Passed
11/01/2023 COT - RSBU - Interior Shear Bracing Passed
01/03/2024 COT - BULD - SWG Clearance Passed 1/3/23: SWG clearance
01/12/2024 COT - RSEL - Electrical Final Passed
01/12/2024 COT - RSEL - Outdoor Lighting Passed
01/12/2024 COT - RSME - Mechanical Final Passed
01/12/2024 COT - RSPL - Plumbing Final Passed
01/12/2024 RSBU - Building Final Passed
01/12/2024 RSBU - Building Progress Passed
01/12/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
210841 - WESTRIDGE AT SILVERBELL LOT 6 - PT REPORT-2023-10-23_V1.PDF DOCUMENTS VIEW
SPAPP-P22WP00025 FINAL ACCEPTANCE LETTER-2023-10-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-06-23_V1.PDF DOCUMENTS VIEW