Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/18/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35G T21-M0090

Permit Reviews

Permit Number - TC-MDP-0523-01044
Permit Status: Issued
Permit Description: SFR RKK35G T21-M0090
Start Date Submittal Complete Date Status  
05/24/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/09/2023 APPROVED Review Details
11/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/21/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01044
Permit Status: Issued
Permit Description: SFR RKK35G T21-M0090
Date Description Comments
05/24/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/24/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/24/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/21/2023 Post-Tension Inspection Report is required.
05/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/24/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01044
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/13/2023 COT - RSPL - Sewer Passed
06/13/2023 COT - RSPL - Rough Soil Passed
06/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed passed
06/20/2023 COT - RSBU - Preslab Passed passed
06/20/2023 COT - RSEL - Electrical Underground Passed passed
06/20/2023 COT - RSEL - Grounding/Bonding Passed passed
07/17/2023 COT - RSBU - Roof Nailing Passed
07/19/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/18/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/18/2023 COT - RSPL - Gas Pressure Test Passed
08/29/2023 COT - RSBU - Interior Shear Bracing Passed
09/18/2023 BULD - Electrical Clearance Passed TEP ECO
11/13/2023 COT - BULD - SWG Clearance Passed SWG clearance issued.
11/20/2023 COT - RSEL - Electrical Final Passed
11/20/2023 COT - RSEL - Outdoor Lighting Passed
11/20/2023 COT - RSME - Mechanical Final Passed
11/20/2023 COT - RSPL - Plumbing Final Passed
11/20/2023 RSBU - Building Final Passed
11/20/2023 COT - RSPL - Yard Water Line Passed
11/20/2023 RSBU - Building Progress Passed
11/20/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
220365 - RINCON KNOLLS LOT 201 - PT REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-05-18_V1.PDF DOCUMENTS VIEW