Permit: TC-MDP-0523-01039
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12730 E HUSTON CANYON WY
Address NEW:
12730 E HUSTON CANYON WY
Apply Date:
08/31/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Permit Reviews
Permit Number - TC-MDP-0523-01039
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/01/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/05/2023 | APPROVED |
| 09/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2023 | APPROVED |
| 02/16/2024 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 03/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-01039
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/12/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 04/12/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/12/2024 | Post-Tension Inspection Report is required. |
| 04/12/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0523-01039
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
| Date | Description | Comments |
|---|---|---|
| 04/12/2024 | NO FINAL UNTIL THE DISCHARGE AUTHORIZATIONFOR #P21SD00033 IS ISSUED BY PDEQ | |
| 04/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01039
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2024 | COT - RSPL - Rough Soil | Passed | ||
| 04/12/2024 | COT - RSPL - Sewer | Passed | ||
| 04/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 04/29/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed per plans and passed 3rd party inspection, rebar reinforcement is installed per plans, masa clips are properly spaced and secured to edge of form, shear wall clips are secured to form and in their proper location, all underground plumbing pipes are properly wrapped with foam to protect from damage, and underground electrical is properly installed for kitchen island. Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 05/15/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/15/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/06/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 06/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/07/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/18/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/13/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 8/13/2024 | |
| 08/23/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed where required. Outdoor lighting meets plan requirements and city regulations. Okay to issue Certificate of Occupancy. | |
| 08/23/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed where required. Outdoor lighting meets plan requirements and city regulations. Okay to issue Certificate of Occupancy. | |
| 08/23/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed where required. Outdoor lighting meets plan requirements and city regulations. Okay to issue Certificate of Occupancy. | |
| 08/23/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed where required. Outdoor lighting meets plan requirements and city regulations. Okay to issue Certificate of Occupancy. | |
| 08/23/2024 | ENGR Engineering Final | Passed | ||
| 08/23/2024 | RSBU - Building Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed where required. Outdoor lighting meets plan requirements and city regulations. Okay to issue Certificate of Occupancy. | |
| 08/23/2024 | RSBU - Building Progress | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed where required. Outdoor lighting meets plan requirements and city regulations. Okay to issue Certificate of Occupancy. |