Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01027
Permit Details
Apply Date:
05/26/2023
Applicant:
Description:
DPLX SWC2152 T21-M0059
Permit Reviews
Permit Number - TC-MDP-0523-01027
Permit Status: Inspections complete
Permit Description: DPLX SWC2152 T21-M0059
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/02/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 11/06/2023 | REQUIRES RESUBMIT |
08/07/2023 | RESTAMP - RESIDENTIAL v.1 | 08/07/2023 | APPROVED |
07/17/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 08/07/2023 | APPROVED |
05/31/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/08/2023 | REQUIRES RESUBMIT |
11/08/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 11/08/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-01027
Permit Status: Inspections complete
Permit Description: DPLX SWC2152 T21-M0059
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/08/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0523-01027
Permit Status: Inspections complete
Permit Description: DPLX SWC2152 T21-M0059
Date | Description | Comments |
---|---|---|
05/31/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01027
Permite Description: DPLX SWC2152 T21-M0059
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2023 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | |
11/15/2023 | COT - RSPL - Yard Water Line | N/A | Partial Pass | 11/15/23: Unit2 main water line under pressure 30ft of pex ran towards meter. Pending connection to meter and pending unit 1. |
02/02/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
02/02/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
02/02/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0523-01027
Permit Description: DPLX SWC2152 T21-M0059
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/15/2023 | |
08/18/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footing is properly dug and matches plans. Rebar reinforcement is in place in footings per the plans. Underground plumbing pipes are properly wrapped and taped that come through the concrete slab. User ground is attached to a 20' piece of rebar reinforcement in the bottom of footer. | |
08/18/2023 | COT - RSBU - Preslab | Passed | Footing is properly dug and matches plans. Rebar reinforcement is in place in footings per the plans. Underground plumbing pipes are properly wrapped and taped that come through the concrete slab. User ground is attached to a 20' piece of rebar reinforcement in the bottom of footer. | |
08/18/2023 | COT - RSEL - Grounding/Bonding | Passed | Footing is properly dug and matches plans. Rebar reinforcement is in place in footings per the plans. Underground plumbing pipes are properly wrapped and taped that come through the concrete slab. User ground is attached to a 20' piece of rebar reinforcement in the bottom of footer. | |
09/11/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/11/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/14/2023 | RSBU - Building Progress | Passed | wanted firewall inspected. | |
09/15/2023 | BULD - Electrical Clearance | Passed | Two meters; units 1 and 2. | |
09/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, plumbing, and electrical rough-in are complete. Okay to insulate, drywall, tape, texture, and paint interior walls and ceilings. | |
09/21/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | Observed 2 layers at attic and one layer at East side below attic. Need to fire caulk penetrations. 9/21/23:passed |
|
09/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | Observed 2 layers at attic and one layer at East side below attic. Need to fire caulk penetrations. 9/21/23:passed |
|
11/09/2023 | COT - RSPL - Sewer | Passed | 11/9/23: ok to back fill | |
01/12/2024 | COT - RSPL - Yard Water Line | Passed | 1/12/24:ok to backfill | |
02/02/2024 | COT - RSEL - Electrical Final | Passed | ||
02/02/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/02/2024 | COT - RSME - Mechanical Final | Passed | ||
02/02/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/02/2024 | RSBU - Building Final | Passed | ||
02/02/2024 | ENGR Engineering Final | Passed |