Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/18/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0523-01012
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
07/18/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/19/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01012
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 3
Date Name
07/18/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/19/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01012
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
05/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01012
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/17/2023 COT - RSPL - Yard Water Line Passed
08/17/2023 COT - RSPL - Rough Soil Passed
08/17/2023 COT - RSPL - Sewer Passed
08/25/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/25/2023 COT - RSBU - Preslab Passed
08/25/2023 COT - RSEL - Electrical Underground Passed
08/25/2023 COT - RSEL - Grounding/Bonding Passed
09/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/06/2023 COT - RSBU - Roof Nailing Passed
10/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/09/2023 COT - RSPL - Gas Pressure Test Passed
10/17/2023 COT - RSBU - Interior Shear Bracing Passed
10/24/2023 BULD - Electrical Clearance Passed 10/24/23: TEP ECO clearance issued
01/05/2024 COT - BULD - SWG Clearance Passed All gas appliance piping has the proper shut off valves installed. Okay to install meter and turn on gas.
01/05/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled. Electrical outlets in bathrooms, kitchen, garage, and exterior are GFCI protected.
01/05/2024 COT - RSEL - Outdoor Lighting Passed Exterior lights are installed per plan details.
01/05/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled. Electrical outlets in bathrooms, kitchen, garage, and exterior are GFCI protected.
01/05/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled. Electrical outlets in bathrooms, kitchen, garage, and exterior are GFCI protected.
01/05/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully functional. Electrical panel is properly labeled. Electrical outlets in bathrooms, kitchen, garage, and exterior are GFCI protected.
01/05/2024 RSBU - Building Progress Passed
01/05/2024 ENGR Engineering Final Passed Clean mud and landscape rock from left side.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA - LOT 49 START_V1.PDF DOCUMENTS VIEW
BTII 49 SIC-2023-07-18_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW