Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/27/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-0523-01009
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
06/28/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/30/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01009
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date Name
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0523-01009
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
05/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/28/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01009
Permite Description: SFR BT1383-130 T22-M0014
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/27/2023 COT - RSPL - Gas Pressure Test N/A Re-inspection required Gauge has less than 1lb.
09/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass Need gas test approval; OK to proceed elsewhere.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01009
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/21/2023 COT - RSPL - Backwater Valve Passed
07/21/2023 COT - RSPL - Rough Soil Passed
07/21/2023 COT - RSPL - Yard Water Line Passed
07/21/2023 COT - RSPL - Sewer Passed
08/02/2023 COT - RSEL - Grounding/Bonding Passed
08/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/02/2023 COT - RSBU - Preslab Passed
08/02/2023 COT - RSEL - Electrical Underground Passed
08/18/2023 COT - RSBU - Roof Nailing Passed
08/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/28/2023 COT - RSPL - Gas Pressure Test Passed
09/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/10/2023 COT - RSBU - Interior Shear Bracing Passed
11/08/2023 BULD - Electrical Clearance Passed
12/15/2023 COT - BULD - SWG Clearance Passed Gas valves are installed at each gas appliance location. Okay to install meter and turn on gas to home.
1/8/24 clearance resent
12/15/2023 COT - RSEL - Electrical Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is per plan and operational.
12/15/2023 COT - RSME - Mechanical Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 COT - RSPL - Plumbing Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 RSBU - Building Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 RSBU - Building Progress Passed
12/15/2023 ENGR Engineering Final Passed Rebar is protruding from footer on right side gate opening entering to backyard and site Superintendent is not answering phone to get this information.

City of Tucson will not assume any liability.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA 35 SIC-2023-06-27_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 35 START_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW