Permit: TC-MDP-0523-01009
Permit Details
Apply Date:
06/27/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014
Permit Reviews
Permit Number - TC-MDP-0523-01009
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/30/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-01009
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/28/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/28/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0523-01009
Permit Status: Complete
Permit Description: SFR BT1383-130 T22-M0014
Date | Description | Comments |
---|---|---|
05/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/28/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01009
Permite Description: SFR BT1383-130 T22-M0014
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2023 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | Gauge has less than 1lb. |
09/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | Need gas test approval; OK to proceed elsewhere. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01009
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/21/2023 | COT - RSPL - Backwater Valve | Passed | ||
07/21/2023 | COT - RSPL - Rough Soil | Passed | ||
07/21/2023 | COT - RSPL - Yard Water Line | Passed | ||
07/21/2023 | COT - RSPL - Sewer | Passed | ||
08/02/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
08/02/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/02/2023 | COT - RSBU - Preslab | Passed | ||
08/02/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/22/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/28/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
09/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/10/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
11/08/2023 | BULD - Electrical Clearance | Passed | ||
12/15/2023 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at each gas appliance location. Okay to install meter and turn on gas to home. 1/8/24 clearance resent |
|
12/15/2023 | COT - RSEL - Electrical Final | Passed | 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections. | |
12/15/2023 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is per plan and operational. | |
12/15/2023 | COT - RSME - Mechanical Final | Passed | 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections. | |
12/15/2023 | COT - RSPL - Plumbing Final | Passed | 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections. | |
12/15/2023 | RSBU - Building Final | Passed | 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections. | |
12/15/2023 | RSBU - Building Progress | Passed | ||
12/15/2023 | ENGR Engineering Final | Passed | Rebar is protruding from footer on right side gate opening entering to backyard and site Superintendent is not answering phone to get this information. City of Tucson will not assume any liability. |