Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0523-01006
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Start Date Submittal Complete Date Status  
04/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/29/2024 APPROVED Review Details
01/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01006
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Date Description Comments
01/08/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/11/2024 Post-Tension Inspection Report is required.
05/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/29/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01006
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/21/2024 COT - RSPL - Rough Soil Passed
02/21/2024 COT - RSPL - Yard Water Line Passed
02/22/2024 COT - RSPL - Sewer Passed
03/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/08/2024 COT - RSBU - Preslab Passed
03/08/2024 COT - RSEL - Electrical Underground Passed
03/08/2024 COT - RSEL - Grounding/Bonding Passed
03/28/2024 COT - RSBU - Roof Nailing Passed
03/28/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/29/2024 BULD - Electrical Clearance Passed TEP ECO CLEARANCE ISSUED.
04/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with installation of insulation and drywall.
04/29/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of air pressure and holding without any leaks.
05/21/2024 COT - RSBU - Interior Shear Bracing Passed
06/27/2024 COT - BULD - SWG Clearance Passed SWG for meter only
07/16/2024 COT - RSEL - Outdoor Lighting Passed
07/16/2024 COT - RSME - Mechanical Final Passed
07/16/2024 RSBU - Building Progress Passed
07/16/2024 ENGR Engineering Final Passed
07/17/2024 COT - RSEL - Electrical Final Passed
07/17/2024 COT - RSPL - Plumbing Final Passed
07/18/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
146133 PT LOT 100 COMPLETE-2024-04-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 100 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 100 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 100 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW