Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01004
Permit Details
Apply Date:
06/27/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0523-01004
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
06/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/30/2023 | APPROVED |
10/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/28/2024 | APPROVED |
10/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01004
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Date | Description | Comments |
---|---|---|
10/21/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/21/2024 | Post-Tension Inspection Report is required. | |
05/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
06/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01004
Permite Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/12/2023 | COT - RSPL - Backwater Valve | N/A | Canceled | 12/12/23: canceled per contractor |
04/09/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01004
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/27/2023 | COT - RSPL - Rough Soil | Passed | ||
11/01/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/01/2023 | COT - RSBU - Preslab | Passed | ||
11/01/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/01/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/16/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/16/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/30/2023 | COT - RSPL - Sewer | Passed | ||
01/19/2024 | COT - RSPL - Backwater Valve | Passed | 1/19/23: Backwater valve installed between house and sewer clean outs. | |
01/19/2024 | BULD - Electrical Clearance | Passed | Ufer ground installed and ground wire connected. TEP ECO Clearance issued. | |
01/19/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is holding 15# of compressed air without any leaks. | |
01/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, plumbing rough-in complete. Okay to proceed with insulation and drywall installation. | |
02/09/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
03/20/2024 | COT - BULD - SWG Clearance | Passed | ||
04/09/2024 | COT - RSEL - Electrical Final | Passed | ||
04/09/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
04/09/2024 | COT - RSME - Mechanical Final | Passed | ||
04/09/2024 | COT - RSPL - Plumbing Final | Passed | ||
04/09/2024 | RSBU - Building Final | Passed | ||
06/07/2024 | ENGR Engineering Final | Passed | Building final passed. no Engineering deficiency. Roof cover good. |